32
5.2.
Height
Sensor
Test
1.
Inspect
foam
pads
and
sensors.
Install
clean
dry
foam
pads
if
necessary.
2.
Perform
this
test
over
level
bare
soil
or
gravel.
The
system
must
be
in
manual
and
Soil
Mode™.
3.
Level
the
booms
and
adjust
the
main
lift
to
the
bottom
of
the
stroke.
4.
Navigate
to
the
height
readings
screen
(Run
Screen
‐
>
Settings
‐
>
Next
‐
>
Next
‐
>
Diagnostics
‐
>
Sensors).
5.
Check
the
readings
of
all
the
height
sensors
while
raising
the
center
section.
6.
A
continuous
and
accurate
height
reading
from
10
inches
(25
cm)
to
80
inches
(200
cm)
should
be
seen.
7.
Repeat
steps
2
to
6
in
Crop
Mode™.
Serial Number
Summary of Contents for UC5 Topcon X30
Page 1: ...NORAC UC5 Operator s Manual ...
Page 15: ...13 Select the setup button The setup screen will be displayed ...
Page 22: ...20 The automatic setup diagnostic screen is reached by selecting the diagnostics button ...
Page 36: ...34 5 3 Communication Tests ...
Page 41: ...39 Typical Self Propelled Sprayer Installation ...
Page 42: ...40 Typical Pull Type Sprayer Installation ...
Page 43: ...41 Typical Front Mount Sprayer Installation ...
Page 44: ...42 Typical Setup for Short Circuit Test ...
Page 56: ...54 7 UC5 Menu Structure ...
Page 57: ...55 ...
Page 58: ...56 ...
Page 60: ...58 7 2 Setup Valves ...
Page 61: ...59 7 3 Setup Switches Switches ...
Page 67: ...65 10 Notes ...
Page 68: ...66 ...