1. Carefully check machine for signs of damage.
Report damages at once to carrier.
2. Check the contents list. Contact distributor for
missing items.
Contents:
D
2 Extraction Brushes
D
2 ReadySpace Rollers
D
Battery Charger (option)
D
4 Batteries (pre-installed option)
D
4 Battery Cables
D
8 Battery Post Covers
D
8 Battery Cable Rubber Boots
D
Battery Strap
D
Battery Tray
3. To uncrate the machine, remove the shipping
hardware that secures the machine to the pallet.
Using the supplied ramp carefully back the
machine off the pallet. Make sure the scrub head is
in the raised position.
ATTENTION: Do not drive machine off pallet
without using the ramp, machine damage may
occur.
BATTERY INSTALLATION
WARNING: Fire Or Explosion Hazard.
Batteries Emit Hydrogen Gas. Keep Sparks And
Open Flame Away. Keep Battery Compartment
Open When Charging.
FOR SAFETY: When installing batteries, wear
protective gloves and eye protection. Avoid
contact with battery acid.
Battery Specifications:
Four 6 volt, deep cycle, 335 AH batteries. Maximum
battery dimensions: 190 mm (7.5 in) W x 324 mm (12.75
in) L x 381 mm (15.00 in) H.
1. Park the machine on a level surface and remove
the key.
2. Lift the operator seat forward and disconnect the
seat sensor wire harness (Figure 1).
FIG. 1
3. Remove the seat from the machine by lifting it up
and away (Figure 2).
FIG. 2
4. Remove the battery compartment shroud from the
machine (Figure 3). A 13 mm socket wrench is
required.