2
3
10
7
N
S
N
S
Northern Hemisphere
Southern Hemisphere
8.
In case of two collectors, first place the left one, lifting
the collector’s upper and lower fixing washers
8
. When
the collector is placed under, we slightly tighten the M8
screws and nuts with the collector’s fixing washers
8
in
order to temporarily restrain it and easily center it with the
system. Place the mechanically tightened unions Ø22 at
the collector’s edges
6.
Repeat for the upper part
9.
Join the second collector and tighten the unions*.
11.
In case of 250lt boiler and above screw reinforcing plate (
10
) to collector beam(
2
) and vertical beam(
3
) with
bolts M8x16 and nuts. Repeat for another side.
7.
In case of installation of a three collectors system, we place the 2 extra
support bases of a 1 collector system, installing them in the same way, on
the left and the right side of the existing support base. On the three support
bases, we place the three collectos according to the following instructions.
We use the mechanically tightened union Ø22ΧØ22 in order to connect
the collectors and tighen.
10.
Screw on the two supports of the tank.Tighten all screws on the base. Properly orientate the base with the
collector. Firmly attach the base using 4 Upat D10 and bolts (M8x60).
Solar water heaters
27
26
Solar water heaters - AELIOS
Solar water heaters - AELIOS