Install all Pulleys (AO & AP) with the
shown spacers & bolting.
16. Start installation of the
Stack Cable
(AU)
by partially threading the hollow bolt into
the
Selector Rod
. Install the
Pulley
above the
Selector Rod
& loop the
Stack
Cable
over it. Loosely install the next 3
inline
Pulleys
& 2
Pulley Cable
Retainers
(19) with the
Stack Cable
looped over the middle
Pulley
. Create a
hanging loop by hanging the
Stack Cable
over the fixed pulley and loosely install the
last
Pulley
along with 2
Floating Pulley
Brackets
(18). Loosely install
Pulley
Bracket
(17) &
Pulley Bracket Cable
Guide
(20) as shown on the end of the
Stack Cable
.
17. Thread 2
Pulley Guide Cables
(AZ)
through the loops on the
Pulley Bracket
Cable Guide
(20) & attach to the
Top
Plate Assy
using shown spacer and
bolting.
AA
AU
AV
AX
AW
18. Installation of the
Lat Cable
(AV) is detailed only for one
side & is typical for both
sides. Complete installation
of
Lat Cable
to one side of
the
Main Upright
using a
4-1/4" Pulley
(AP),
Main
Upright Pulley Bracket
(16)
& shown bolting. Loop
Lat
Cable
under the
Pulley
Cable Retainer
(19), and
over outside pulley. Loop
Lat Cable
under the
Top
Plate Assy
. On the
opposite side, perform the
above instructions in reverse
order.
Tighten the bolt
holding the 3 inline
Pulleys
.
19. Install a
3-1/2" Pulley
& 2
Pulley Brackets
(17) at the
bottom of the loop in the Lat
Cable using the shown
bolting.