F
Service / Repair
NEPTUNE 5 FA_EN_Ver.2.0_25/11
48
Remove the outer top cover and mount the
lifting tool over the two coil ends and fix it with
the nuts. Dismount the 4 nuts
"Arrows"and hook up the crane and lift out the
coil.
When landing on the floor press over to the
side or protect the machine by a piece of card-
board.
Attention : Be aware of the fact that the machi-
ne can tip over. Keep the coil close to the ma-
chine.
Check the flame tube A and B. It is important
that they are solid and whole.
Clean up deposits and change the isolation if
needed.
A
B
Heat exchanger
Fig.F.45: Dismounting coil
Fig.F.46: Dismounting coil
Fig.F.47: Dismounting coil
Fig.F.48: Inspection of coil
Summary of Contents for NEPTUNE 5 FA
Page 1: ...Service Manual NEPTUNE 5 FA NEPTUNE 5 FA_EN_Ver 2 0_25 11 ...
Page 54: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 54 ...
Page 55: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 55 ...
Page 56: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 56 ...
Page 57: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 57 ...
Page 58: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 58 ...
Page 59: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 59 ...
Page 60: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 60 ...
Page 61: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 61 ...