Construction
C
21
NEPTUNE 5 FA_EN_Ver.2.0_25/11
The electric box (Fig.C.6) contains the control board, the transformer. relays, fuses,and connection
terminals. The cover plate is mounted with the main switch, the display, the temperature adjustment
and five status/warningLights (Fig.C.4).
The cover is sealed around the edge and around the manometer and the detergent valve.
Display:
Temperature setting
Error mesage
Running hours
Sevice interval setting
Operation
Fuel
Anti stone
Service
Main switch S1
Display board A2
Main switch S1:
OFF- COLD - HOT
Adjustment:
Temperature settings
Service interval settings
Detergent:
A/B
Pressure
Gauge
Fig.C.4: Operation panel
Fig.C.5: Panel - inside
Fig.C.6: Electrical box
Control board A1
Ignition transformer T1
Fuse F11
Contactor K1
Summary of Contents for NEPTUNE 5 FA
Page 1: ...Service Manual NEPTUNE 5 FA NEPTUNE 5 FA_EN_Ver 2 0_25 11 ...
Page 54: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 54 ...
Page 55: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 55 ...
Page 56: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 56 ...
Page 57: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 57 ...
Page 58: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 58 ...
Page 59: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 59 ...
Page 60: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 60 ...
Page 61: ...H Wiring diagrams NEPTUNE 5 FA_EN_Ver 2 0_25 11 61 ...