7. Installation
7.1 General installation instructions
The installation must only be carried out by
qualified, authorized, and trained personnel
.
The safety instructions in Section 3 must be complied with.
When transporting the gear unit, the notes in Section 6 must be complied with.
Suitable crane harness and lifting gear must be provided.
Before commissioning
▪
Fill the gear unit to the correct oil level, unless the gear unit is provided with lifetime lubrication
▪
Check if the transmission parts are correctly fitted before commissioning
▪
Do not deactivate monitoring and protection devices, even in test operation
If an oil level indicator or sight glass is available, the markings on them or the centre of the oil inspection glass,
are considered the minimum
Oil inspection glass:
Oil level centre
Oil check screw:
The oil level affects
the thread in the
housing bore
Oil quantities
(dependent on ratio, speed, shaft arrangement and installation position)
Build size
P54
P75 /
X75
P90 /
X90
P110 /
X110
P140 /
X140
P170 /
X170
P210 /
X210
P240 /
X240
P280 /
X280
P360
P450
average oil quantity
0.05
0.1 l
0.2 l
0.3 l
0.4 l
1.0 l
2.2 l
2.6 l
3.0 l
9.0
22.0
max. oil quantity
-
-
-
0.35 l
0.6 l
1.2 l
2.5 l
3.5 l
5.0 l
15.0
32.0
7.2 Gear unit installation in plant
During installation or assembly, pay attention and ensure the following:
▪
An even support on a level, vibration-dampened and torsion-free substructure; stress and strain in the
housing must be avoided.
▪
Proper lubrication and ventilation are only possible if the assembly is carried out in accordance with the
drawings and build type.
▪
Tension-free assembly with combined flange or insertion mount attachment
▪
Exact alignment of the gear unit on direct coupling, comply with the manufacturer's details
7.3 Installation positions
(MP = mounting position)