English –
22
English
generated in the control unit (for example movement inversion in the
Closing manoeuvre).
05.
,D@RTQDSGDENQBD@RRODBHjDCHMSGDRS@MC@QC$-(ESGDLNSNQ
force control is used as an auxiliary function for reduction of impact
force, test and identify the setting that obtains the best results.
9.2 - COMMISSIONING
Commissioning can only be performed after positive results of all
test phases. Partial or “makeshift” commissioning is strictly pro-
hibited.
01.
Produce the technical documentation of the automation, which must
include at least the following documents: the overall layout drawing
of the system (see example in
ƄJ
), the electrical wiring diagram
(see example in
ƄJ
), the analysis of risks present and relative
solutions adopted, and the manufacturer’s declaration of conformity
of all devices installed (use appendix 1).
02.
EjW@C@S@OK@SDNMSGDF@SDRODBHEXHMF@SKD@RSSGDENKKNVHMFC@S@
type of automation, name and address of manufacturer (responsible
for commissioning), serial number, year of construction and CE mark.
03.
Permanently attach to the gate the label supplied in the pack, regard-
ing the procedure for manual locking/release of the gearmotor.
Compile and provide the automation owner with the declaration of
conformity (use appendix 2).
05.
Prepare and provide the automation owner with the User’s guide; for
this purpose appendix 3 “User’s guide” may be used as an example”.
06.
Prepare and provide the owner with the form “Maintenance sched-
ule”, containing all maintenance instructions for all devices in the
automation.
07.
Before commissioning the automation, ensure that the owner is ade-
PT@SDKXHMENQLDCNE@KK@RRNBH@SDCQHRJR@MCG@Y@QCR
––– STEP 10 –––
MAINTENANCE AND DISPOSAL
10.1 - PERIODIC MAINTENANCE
Maintenance must be performed in strict observance of the safety
provisions in this manual and according to current legislation and
standards.
In general, the devices in the “ALTO” system do not require special main-
tenance; however, periodic inspections will enable the user to maintain
RXRSDLDEjBHDMBX@MCDMRTQDBNQQDBSNODQ@SHNMNESGDR@EDSXRXRSDLR
installed. Therefore we recommend checks every six months, to ensure
ODQEDBSDEjBHDMBXNE@KKCDUHBDRODQENQLHMF@KKSDRSR@MCBGDBJRCDRBQHADC
in paragraph 10.1 and paragraph “Maintenance operations admitted for
the user” (appendix 3 - Operation guide).
If other devices are present, follow the instructions in the relative mainte-
nance schedule.
10.2 - DEVICE DISPOSAL
This product is an integral part of the automation and therefore
must be disposed together with the latter.
As in installation, also at the end of product lifetime, the disassembly and
RBQ@OOHMFNODQ@SHNMRLTRSADODQENQLDCAXPT@KHjDCODQRNMMDK
This product is made of various types of material, some of which can be
recycled while others must be scrapped. Seek information on the recy-
cling and disposal systems envisaged by the local regulations in your area
for this product category.
Caution!
lRNLDO@QSRNESGDOQNCTBSL@XBNMS@HMONKKTS@MSNQG@Y@QCNTR
substances which, if disposed of into the environment, may cause serious
damage to the environment or physical health.
As indicated by the symbol alongside, disposal of this prod-
uct in domestic waste is strictly prohibited. Separate the
waste into categories for disposal, according to the meth-
ods envisaged by current legislation in your area, or return
the product to the retailer when purchasing a new version.
Caution!
lKNB@KKDFHRK@SHNML@XDMUHR@FDRDQHNTRjMDRHMSGDDUDMSNE
abusive disposal of this product.
31
Summary of Contents for ALTO100C
Page 1: ...GATE AUTOMATION ALTO Instructions and warnings for installation and use ...
Page 10: ...9 English English 1 2 3 45 3 1 2 a c b OK b a a b c d b a 5 6 7 8 9 10 11 12 13 13 ...
Page 13: ...English 12 English OK b a 1 2 17 1 2 16 3 AA ok BB no OK 18 2 1 ...
Page 14: ...13 English English b a 1 2 3 5 6 20 a b 1 2 3 19 ...
Page 35: ...IS0488A00MM_12 01 2017 Nice S p A Via Pezza Alta 13 CDQYN 35 S KX HMEN MHBDENQXNT BNL ...