1
CAUTIONS AND NOTES
2
EXTREMELY IMPORTANT
2
ETL DEFINITIONS COMPLIANT TO UL325
2
1 - OVERVIEW
2
1.1
- Gate controller
2
1.2
- Main control board
2
1.3
-
,@HMBNMSQNKAN@QCRODBHjBR
2
2 - GATE INFORMATION
3
2.1
- ASTM F2200
3
2.2
- Gate material
3
2.3
- Gate latches
3
2.4
-
2ODBHjB@OOKHB@SHNMR
3
2.5
- Swing gates
3
2.6
- General requirements
3
3 - SAFETY AND CAUTIONS
4
3.1
- Properly installed safety devices
4
3.2
- Safety signs, notices to personnel warning signs
4
3.3
- The gate system safety devices
4
3.4
- Infrared beams and warning signs
4
3.5
- Establish the location
4
3.6
- Read and follow all instructions
4
3.7
- Keep children away
4
3.8
- Test the gate system
4
3.9
- Keep gates properly maintained
4
4 - PRE-INSTALLATION NOTES
4
4.1
- Follow Instructions
4
4.2
- Intended usage
4
4.3
- Warnings, cautions and notes
4
5 - SWING OPERATOR CUTAWAY DRAWINGS
6
6 - INSTALLATION PROCEDURES
7
6.1
- Step one-location
7
6.2
- Step two-concrete
7
6.3
- Step three-physical mounting
7
6.4
- Step four-manual release
7
6.5
- Step
jUD
-arm assembly
7
6.6
- Learning and programming features
7
6.7
-
'NVSNRDSTOSGDRXRSDLENQjQRSTRD
8
6.8
- The leaning sequence
8
6.9
- Learning mode
8
7 - CIRCUIT BOARD LAYOUT
9
8 - ACCESSORY INPUTS AND OUTPUTS
10
8.1
- Outputs
10
8.2
- Inputs
10
8.3
- Communication bus
10
8.4
- Programming the plug-in receiver and remote controls
11
9 - WIRING AND CONNECTIONS
12
10 - OPTIONAL INPUTS
12
10.1
- Fire input and fail safe connector
12
10.2
- Fail safe connection
12
10.3
- Magnetic lock connection
13
10.4
- Guard station connection
13
10.5
- Exit and edge inputs wiring diagram
13
10.6
- Radio receiver connection (third party)
13
11 - INSPECTION AND OPERATION
14
12 - GENERAL LAYOUT AND SAFETY ACCESS
14
13 - ACCESSORIES AND SENSORS
15
14 - CONTROL BOARD NOMENCLATURE
16
15 - PROGRAMMING BUTTONS
17
15.1
- Force
17
15.2
- Speed
17
15.3
- Acceleration
17
15.4
- Delay
17
15.5
- Function
17
15.6
- Display
18
16 - GATE DIRECTION REVERSAL
18
17 - RE-ASSEMBLING GATE OPERATOR
19
18 - EMERGENCY VEHICLE ACCESS
19
19 - GLOSSARY
19
20 - MAINTENANCE SCHEDULE - APOLLO GATE OPENER
20
21 - INSTALLATION DRAWING (1)
20
22 - INSTALLATION DRAWING (2)
21
23 - TEMPLATE FOR INSTALLATION (3)
22
24 - COMPACT ARM MEASUREMENTS
23
25 - GATE ARM INSTALLATION
24
26 - MECHANICAL ADJUSTMENT OF GATE CLOSING
POSITION
25
27 - APOLLO GATE OPENER TROUBLESHOOTING
25
28 - PROGRAMMING QUICKSTART
26
28.1
- Learning the gate
26
28.2
- Gate direction reversal
26
28.3
- Putting the controller into learning mode
26
29 - INSTALLATION CHECKLIST
27
TABLE OF CONTENTS
Summary of Contents for 4300 SW
Page 2: ......
Page 26: ...24 25 GATE ARM INSTALLATION Figure 33 CORRECT LAYOUT INCORRECT INSTALLATION Figure 34...
Page 30: ......
Page 31: ......