Step 23:
•
Now the tricky part. The ‘A’
-frame is designed to be at an 82° angle (i.e it is not at 90 degrees
to the ground)
•
The ‘A’
-frame should be then lined up to the centre of the frame
•
The holes on the ground should then be marke
d and the ‘A’
-frame should be sunk into its
place so that the monkey bar is level. If your garden is level, holes about 250mm-300mm will
suffice. If your garden is running at a slope, you may need to dig the holes deeper or
shallower depending on which way the ground is falling. The aim is to level the monkey bar
as well as th
e 3” x 1.5” support on the A frame
Summary of Contents for Mount Juliet
Page 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Page 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Page 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 29: ......
Page 36: ......
Page 38: ......
Page 42: ......
Page 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Page 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...