Step 3:
•
Make a mark 2400mm (2.4m) from the top of both 3m posts.
If your frame has a picnic or
sandpit picnic table, add a second mark to each post 2100mm down from the top of the
post
•
Using a piece of 1755mm 3” x 1.5” timber and the 65mm d
ecking screws, screw the timber
to the 3m posts at the 2.4m mark you made on the posts (this is to strengthen the H-frame
structure, without this additional support at the bottom the frame will twist once it is lifted
up)
Summary of Contents for Mount Juliet
Page 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Page 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Page 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 29: ......
Page 36: ......
Page 38: ......
Page 42: ......
Page 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Page 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...