Assembly Instructions
All components needed during the assembly are numbered with reference to the parts list, please
refer back to the parts list to ensure you are assembling the correct components for each step.
Step 1:
‘H
-
Frame’ Assembly
•
Lay 2 3m posts that are cut at a 40° angle on a level surface
•
Ensure the cut angle is facing the same way on both posts and the holes are on the outside
Step 2:
•
Place the 1575mm 4” x 4” post between the 2 longer posts and line up with the 32mm holes
about halfway down the posts. Screw the posts together on both sides using the 200mm
index screws. Use 2 screws for each 32mm hole
Summary of Contents for Mount Juliet
Page 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Page 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Page 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 29: ......
Page 36: ......
Page 38: ......
Page 42: ......
Page 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Page 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...