•
For the two sides with 4” x 4” posts with the 3” x 1.5” base supports sitting on them
, the
decking screws should be screwed in from beneath at an angle
between each of the 3” x
1.5” base supports
Step 10:
•
To secure each railing to the upright posts, screw through the upright posts to the railing
using the 120mm screws (2 into each 32mm hole)
Summary of Contents for Mount Juliet
Page 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Page 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Page 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 29: ......
Page 36: ......
Page 38: ......
Page 42: ......
Page 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Page 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...