
Step 29: Fireman
’
s Pole Assembly
•
Place the fireman’s pole into its position and mark the position that it will go into the
ground, which will be the centre of the railing and out the same distance as the turn in the
pole itself.
•
Dig a hole about 10” deep and 10” in diameter.
•
Place the fir
eman’s pole into the hole and cut off any excess length so that the pole can be
secured into the top rail.
•
Secure the climbing pole onto the top rail using 6x60 screws supplied.
•
Concrete the pole into its place ensuring that it remains parallel to the tower posts.
Summary of Contents for Highlands Commercial
Page 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Page 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 28: ......
Page 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Page 34: ......
Page 36: ......
Page 38: ......
Page 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...