
•
For the two sides with 4” x 4” posts with the 3” x 1.5” base supports sitting on them
, the
decking screws should be screwed in from beneath at an angle between each of the 3” x
1.5” base
supports.
Step 10:
•
To secure each railing to the upright posts, screw through the upright posts to the railing
using the 120mm screws (2 into each 32mm hole)
Summary of Contents for Highlands Commercial
Page 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Page 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 28: ......
Page 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Page 34: ......
Page 36: ......
Page 38: ......
Page 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...