![NI Climbing Frames Highlands Commercial Instruction Manual Download Page 23](http://html1.mh-extra.com/html/ni-climbing-frames/highlands-commercial/highlands-commercial_instruction-manual_1685725023.webp)
Step 16: Bridge Assembly Step 2
•
Secure the two doubled up 1575
mm 3” x 1.5’’ (one to
each tower) by placing them below the
two doubled up 2.45m lengths of 3” x 1.5’’ and between the 9ft vertical posts.
•
Screw upwards into the two doubled up 2.45m lengths of 3” x 1.5’’ using the 120mm screws.
•
Drill 32mm holes (about 30mm deep) on the outside of the main posts and screw two
120mm screws into each hole to secure the doubled-up timbers to the vertical posts.
Summary of Contents for Highlands Commercial
Page 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Page 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 28: ......
Page 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Page 34: ......
Page 36: ......
Page 38: ......
Page 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...