
Step 9: Railings Assembly
•
There are 4 railings per tower.
Ensure to fit the railings in their correct positions depending
on the desired layout of the frame. The tall rails are for the bridge entrance.
They should fit
tightly into place between the upright posts and on the base.
•
The ‘double’ timbers on the railings should be on top and the single timber should be at the
bottom.
•
Secure the bottom rail to the base using the decking screws.
Summary of Contents for Highlands Commercial
Page 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Page 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Page 25: ......
Page 27: ......
Page 28: ......
Page 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Page 34: ......
Page 36: ......
Page 38: ......
Page 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...