NewMar SPS 12-20 Installation & Operation Manual Download Page 9

P.O. Box 1306

 Newport Beach

   California 92663

   

  

Phone: 714-751-0488  

     Fax: 714-957-1621

     E-Mail: [email protected]

2.6.3  Alarm Wiring in Parallel

The internal alarm cards of multiple parallel units can be connected in parallel (using RJ45  Cat. 5 style patch 

cord, Newmar part # 466-2524-0, 24” length) so that the alarm condition can be reported if any alarm is triggered 

in any SPS.

When units are connected in parallel (and load sharing), the alarm outputs give the status of all the SPSs in 

parallel. This means that you only need to connect one alarm card to the alarm circuitry when the units are 

connected in parallel.

2.7 

Start-UP

1) Make sure that all cables and wires are disconnected from the SPS.

2) Plug the AC cable into the SPS and switch the AC on at the outlet. The AC LED should glow green.

3) Disconnect the mains, then plug in the Temperature Compensation Probe, re-connect AC and check that 

    the Temperature Probe LED is green.

4) Disconnect the AC, then double check the polarity of the cables from the battery (there should be a fuse in the 

    battery lead as close as possible to the battery to protect the wiring from faulty connections) and 

    then plug them into the SPS. Re-connect the mains and the Float Boost LED should glow first yellow then 

    after about 10 seconds either green or yellow depending on the charge of the battery. The display LEDs should 

    give an indication of the current from the rectifier.

5) Disconnect the AC, then double check the polarity of the cables to the load, and then plug them into the 

    SPS. Re-connect the AC.

6) If there is more than a unit connected in parallel, then follow the above procedure for each in 

    turn (with the others all disconnected). Ensure all SPSs are adjusted to the same output voltage 

    (better than ±0.1V) Finally connect the Load Share Signal cable between the units, and check that all 

    are indicating near equal current (should be better than 10% of full load).

7) Connect the alarms (if fitted/used) and check their operation.

Servicing

If the rectifier develops an operational fault or is damaged in any way, contact NEWMAR technical assistance by 

calling 800-854-3906 or by email: [email protected].

3.1 

Warnings

This rectifier contains no user serviceable components. Do not disassemble the rectifier.

To isolate the unit from the AC, simply unplug the IEC connector from the unit.

9

AC Fail = not rectifier fail

AC Fail = rectifier fail (factory default)

Alarm Output Volt Low Set

Alarm Output Volt High Set

Summary of Contents for SPS 12-20

Page 1: ...2 Troubleshooting 10 1 9 Input Over Voltage Shut Down 4 3 3 Fuses 10 1 10 Input Inrush Current Limiter 4 4 Adjustments 10 1 11 Over Temperature Shutdown 4 4 1 Standard Settings 11 1 12 Reverse Polari...

Page 2: ...e the present state of the rectifier and diagnose faults AC On This LED glows green to indicate that AC power is connected to the unit and that the primary stages of the rectifier are operating Shutdo...

Page 3: ...ches the battery ve supply the v is common with the battery Do not connect the Battery and Load v together The LVD voltage and the LVD Hysterisis voltage are preset in the factory but may be adjusted...

Page 4: ...if they fail 1 13 Parallel Rectifier Operation The SPS may be connected in parallel to source more current or to provide a degree of redundancy The rectifiers should have the load share signal connect...

Page 5: ...ethal even after the input supply has been removed The rectifier contains components at High Temperatures that may burn if touched 2 2 Positioning of SPS A great deal of care should be taken with posi...

Page 6: ...t outlet be used so the rectifier will not be accidentally unplugged from the supply When hard wiring AC input the IEC AC cord provided should be wired as follows BLK WHT GRN 120 VAC L N Safety Ground...

Page 7: ...w an internal protection fuse requiring the SPS to be returned for servicing Do not connect the Temperature Compensation Probe to the Site Power System until commissioning see Section 2 7 Start Up 2 5...

Page 8: ...fier Fail alarm Rectifier Off Normal and the Low Volts alarms will also activate Note that the AC Fail Relay has its own Common connector but all the other alarm outputs share a Common contact 2 6 2 R...

Page 9: ...y connections and then plug them into the SPS Re connect the mains and the Float Boost LED should glow first yellow then after about 10 seconds either green or yellow depending on the charge of the ba...

Page 10: ...e current drawn by the battery from the SPS is as expected Check that the battery takes the charge Connect the DC load to the SPS with AC off and disconnect the battery Turn AC on and check that the c...

Page 11: ...m back of unit with AC input socket on left 4 2 Adjust Float Voltage Connect a variable load set to minimum load to the battery connections of the rectifier Disconnect the Temperature Compensation Pro...

Page 12: ...ction Disconnect the Temperature Compensation Probe Connect an accurate voltmeter across the output Turn the mains on to the rectifier and adjust the variable voltage power supply up until the unit go...

Page 13: ...ature Compensation Probe Connect an accurate voltmeter across the output Turn AC and adjust the variable voltage power supply up until the alarm activates Adjust the Alarm Output High trimpot to adjus...

Page 14: ...P O Box 1306 Newport Beach California 92663 Phone 714 751 0488 Fax 714 957 1621 E Mail techservice newmarpower com 7 Dimensional Drawings 14...

Reviews: