NewMar SPS 12-20 Installation & Operation Manual Download Page 10

P.O. Box 1306

 Newport Beach

   California 92663

   

  

Phone: 714-751-0488  

     Fax: 714-957-1621

     E-Mail: [email protected]

 

DANGER 

Do not operate if the covers are damaged or removed in any way. 

-

 

The rectifier contains voltages that may be lethal even after the input 

supply has been removed

 

-

 

The rectifier contains components at High Temperatures that may burn if 

touched

 

3.2 

Troubleshooting

Basic operation checks:

• Check power to the rectifier – check that the AC LED is on

• Check and resolve any fault conditions indicated by the status indicators

• Check that the display is showing that it is delivering current

• Disconnect load and battery leads. Connect a load to the battery terminals. Check the voltage across the load is 

   as expected

• Connect a current meter in series with the load. Adjust the load and check the current delivered by the rectifier 

   is as expected

Load Checks:

• Connect battery but disconnect the main load to rectifier. Connect a current meter in series with the battery. 

   Verify the current drawn by the battery from the SPS is as expected. Check that the battery takes the charge.

• Connect the DC load to the SPS with AC off and disconnect the battery. Turn AC on and check that the

   current drawn by the load is as expected, and within the capabilities of the SPS and battery.

Fine Adjustment Checks: 

(see 

Section 4

 on adjustments for instructions)

• Check Boost and Float voltages

• Check Boost to Float current

• Check Temperature Compensation Slope

• Check LVD operation

 

3.3 

Fuses

Although there are fuses inside the rectifier, these are rated such that their failure indicates a fault requiring 

qualified service. Do not attempt to replace these fuses.

However for IEC 60950 the fuse ratings are required to be specified. The following fuses are soldered to the PCB:

• FH101 – 125mA 250V ETF Bussmann

Model

FH1, FH2

FH200, FH401

FH201, FH402

SPS 12-20

5A 250V ceramic slow blow

40A 32V Blade 

-

SPS 24-10

5A 250V ceramic slow blow

40A 32V Blade 

-

SPS 48-6

5A 250V ceramic slow blow

40A 58V Blade

-

Adjustments

The SPS is supplied from the factory with all the adjustments set for normal operation. These settings are detailed 

below. A competent technician only should adjust these settings.

10

Summary of Contents for SPS 12-20

Page 1: ...2 Troubleshooting 10 1 9 Input Over Voltage Shut Down 4 3 3 Fuses 10 1 10 Input Inrush Current Limiter 4 4 Adjustments 10 1 11 Over Temperature Shutdown 4 4 1 Standard Settings 11 1 12 Reverse Polari...

Page 2: ...e the present state of the rectifier and diagnose faults AC On This LED glows green to indicate that AC power is connected to the unit and that the primary stages of the rectifier are operating Shutdo...

Page 3: ...ches the battery ve supply the v is common with the battery Do not connect the Battery and Load v together The LVD voltage and the LVD Hysterisis voltage are preset in the factory but may be adjusted...

Page 4: ...if they fail 1 13 Parallel Rectifier Operation The SPS may be connected in parallel to source more current or to provide a degree of redundancy The rectifiers should have the load share signal connect...

Page 5: ...ethal even after the input supply has been removed The rectifier contains components at High Temperatures that may burn if touched 2 2 Positioning of SPS A great deal of care should be taken with posi...

Page 6: ...t outlet be used so the rectifier will not be accidentally unplugged from the supply When hard wiring AC input the IEC AC cord provided should be wired as follows BLK WHT GRN 120 VAC L N Safety Ground...

Page 7: ...w an internal protection fuse requiring the SPS to be returned for servicing Do not connect the Temperature Compensation Probe to the Site Power System until commissioning see Section 2 7 Start Up 2 5...

Page 8: ...fier Fail alarm Rectifier Off Normal and the Low Volts alarms will also activate Note that the AC Fail Relay has its own Common connector but all the other alarm outputs share a Common contact 2 6 2 R...

Page 9: ...y connections and then plug them into the SPS Re connect the mains and the Float Boost LED should glow first yellow then after about 10 seconds either green or yellow depending on the charge of the ba...

Page 10: ...e current drawn by the battery from the SPS is as expected Check that the battery takes the charge Connect the DC load to the SPS with AC off and disconnect the battery Turn AC on and check that the c...

Page 11: ...m back of unit with AC input socket on left 4 2 Adjust Float Voltage Connect a variable load set to minimum load to the battery connections of the rectifier Disconnect the Temperature Compensation Pro...

Page 12: ...ction Disconnect the Temperature Compensation Probe Connect an accurate voltmeter across the output Turn the mains on to the rectifier and adjust the variable voltage power supply up until the unit go...

Page 13: ...ature Compensation Probe Connect an accurate voltmeter across the output Turn AC and adjust the variable voltage power supply up until the alarm activates Adjust the Alarm Output High trimpot to adjus...

Page 14: ...P O Box 1306 Newport Beach California 92663 Phone 714 751 0488 Fax 714 957 1621 E Mail techservice newmarpower com 7 Dimensional Drawings 14...

Reviews: