background image

25

Maintenance

New Brunswick Innova

®

 2000/2050 Shaker

English (EN)

6

Maintenance

6.1

Routine maintenance

No routine maintenance is required for the Innova 2000/2050 Shaker.

The MAINT indicator light illuminates at the end of 10000 hours of use. At that time, contact your local 
Eppendorf Service Engineer, or call the Eppendorf Service Department. This periodic maintenance will 
keep your unit in premium condition.

6.2

Cleaning external and internal surfaces

The unit may be cleaned using a damp cloth or any standard household or laboratory cleaner to wipe down 
its outer surfaces. Do not use abrasive or corrosive compounds to clean this instrument, as they may 
damage the unit. 

6.3

Fuse replacement

To replace fuses (without changing the fusing arrangement):

WARNING! 

Before performing any service, turn off the power, using the ON/OFF switch on the rear 
panel, and disconnect the power cord.

WARNING! Personnel injury and equipment damage!

When cleaning the unit, always turn off the shaker and disconnect the power cord from the 
power supply. 

WARNING! Risk of electric shock when replacing fuses!

Turn off shaker and disconnect from mains/power supply.

CAUTION! 

A detachable main power cord has been provided with your unit.

Only use the cord provided with the unit.

Summary of Contents for innova 2000

Page 1: ...nual ck Innova 2000 2050 Shaker EN g manual New Brunswick Innova 2000 2050 Shaker Operating manual...

Page 2: ...ior permission of the copyright owner Eppendorf and the Eppendorf logo are registered trademarks of Eppendorf AG Germany New Brunswick and the New Brunswick logo are trademarks of Eppendorf AG Germany...

Page 3: ...4 1 LED display 12 3 4 2 Keypad 13 3 4 3 Status indicators 13 3 4 4 Function indicators 13 3 5 Platform assemblies 13 3 6 Heavy duty construction 14 3 6 1 Bearings 14 3 6 2 Motor 14 3 6 3 Triple ecce...

Page 4: ...or option 23 5 8 Recorder adaptation 23 6 Maintenance 25 6 1 Routine maintenance 25 6 2 Cleaning external and internal surfaces 25 6 3 Fuse replacement 25 7 Technical data 27 7 1 Specifications 27 7 1...

Page 5: ...If this manual is lost please request another one The latest version can be found on our website www eppendorf com international or www eppendorfna com North America 1 2 Danger symbols and danger leve...

Page 6: ...ctions New Brunswick Innova 2000 2050 Shaker English EN 6 1 3 Symbols used Example Meaning You are requested to perform an action 1 2 Perform these actions in the sequence described List References us...

Page 7: ...ured by Eppendorf WARNING Heavy Do not attempt to lift the Innova 2000 2050 Shaker by yourself Ask for assistance or use suitable equipment when raising or handling the device WARNING Risk of explosio...

Page 8: ...Safety New Brunswick Innova 2000 2050 Shaker English EN 8...

Page 9: ...ustration Abb 3 1 Innova 2000 2050 front view Fig 3 1 Innova 2000 2050 front view 1 Platform 2 Temperature monitor RTD probe and bracket Optional 3 Control panel Unless otherwise indicated all drawing...

Page 10: ...processor controller with instantaneous digital feedback controls the speed over a range of 25 500 RPM 3 2 1 Operation The shaker may be operated either continuously or in a timed mode via a programma...

Page 11: ...e voltage and fusing This universal power entry system adapts to worldwide power requirements Voltage and fusing has been set prior to shipment Innova shakers are available in 100 V 120 V 220 V and 24...

Page 12: ...ol panel has a 3 digit LED display During normal shaker operation the display will indicate Shaker status ON OFF Shaking speed Setpoints Hours remaining timed run Measured temperature when temperature...

Page 13: ...p 31 START STOP Starts and stops the drive Activates or stops timer when timed run is desired Keys Adjusts the setpoint of a displayed parameter up or down Used to enter the SET mode for setpoint chan...

Page 14: ...low maintenance The motor has a rating of 1 20 horsepower 3 6 3 Triple eccentric drive The drive mechanism utilizes a counterweight system to stabilize the rotary motion produced during operation When...

Page 15: ...Temperature monitor option A Temperature Monitor Option is available for installation on the Innova 2000 2050 The ambient temperature or the temperature of the liquid in any vessel can be measured usi...

Page 16: ...Product description New Brunswick Innova 2000 2050 Shaker English EN 16...

Page 17: ...service package is included with the unit 4 3 Space requirements It is essential that the unit be situated in an area where there is sufficient space for the shaker and platform to clear walls and ot...

Page 18: ...G Do not position the equipment so that it is difficult to operate the disconnecting device main plug For service reasons and for cases of emergencies sufficient space must be provided for easy access...

Page 19: ...l outlet 4 5 Install the platform A platform purchased separately must be installed on the unit prior to use 1 Set the mains power switch to off 2 Place the platform on the subplatform Make sure that...

Page 20: ...purchased flask clamps for use with a universal platform they will require installation All clamps are shipped complete with hardware 1 Clamps are installed by securing the base of the clamp to the pl...

Page 21: ...llowing steps 2 4 During speed changes the alarm may sound until the speed returns to within 5 rpm of the setpoint 5 3 Checking setpoints To check any setpoint 1 Press the SELECT key to illuminate the...

Page 22: ...e the alarm according to your needs 5 5 1 Stopping the alarm When the alarm sounds you can stop it by pressing the SELECT key and changing to any other function 5 5 2 Deactivating the alarm The alarm...

Page 23: ...erature or the temperature of any vessel on the shaker platform can be measured with the probe 1 Remove the probe from its holder and insert it into the vessel to be monitored 2 Use the SELECT key to...

Page 24: ...gnal conditioning that accepts 0 5 V input For temperature each chanel should have a signal conditioning that accepts 0 5 V input A mating connector is required on the recorder cable not supplied but...

Page 25: ...r laboratory cleaner to wipe down its outer surfaces Do not use abrasive or corrosive compounds to clean this instrument as they may damage the unit 6 3 Fuse replacement To replace fuses without chang...

Page 26: ...ve the cover fuse block located on the rear of the unit 3 Remove the old fuse 4 Insert a new one of the same type 5 Replace the cover fuse block into the power module Abb 6 1 Power entry module Fig 6...

Page 27: ...LED display Indicates speed running time alarm conditions and displays readout of internal clock actual accumulated operating time Automatic restart Automatic restart after power is restored indicated...

Page 28: ...specifications with up to 10 line voltage fluctuation To attain speed accuracy at 401 500 the line voltage cannot be lower than 5 of the rated voltage The Innova 2000 can be upgraded to a larger capac...

Page 29: ...speed running time alarm conditions and displays readout of internal clock actual accumulated operating time Automatic restart Automatic restart after power is restored indicated by flashing display...

Page 30: ...nnova 2000 2050 Shaker English EN 30 At 25 400 rpm the unit will perform to specifications with up to 10 line voltage fluctuation To attain speed accuracy at 401 500 rpm the line voltage cannot be low...

Page 31: ...2 for 125 ml Erlenmeyer flasks M1190 9917 8 for 250 300 ml Erlenmeyer flasks M1190 9918 6 for 500 ml Erlenmeyer flasks AG2 TA25 18 Test Tube Rack Slant Part number Number of clamps Description 30 5 x...

Page 32: ...ype ACE 105 10 mL Erlenmeyer ACE 255 25 mL Erlenmeyer ACE 505 50 mL Erlenmeyer ACE 125S 125 mL Erlenmeyer ACE 250S 250 mL Erlenmeyer ACE 500S 500 mL Erlenmeyer ACE 1000S 1 0 L Erlenmeyer ACE 2000S 2 0...

Page 33: ...P0320 0340 4100 uF Capacitor 1 P0460 4091 Diode Bridge 1 P0360 4040 130 V Varistor 2 M1190 5320 Small Motor Assembly 1 M1190 9940 Main Control PCB 1 M1190 5000 Membrane Sw Panel 1 P0460 2200 Power En...

Page 34: ...5 8 15 87 mm flat Phillips head screw S2116 3101 1 19 05 mm 3 4 in thick wood platform 10 24 x 5 16 7 9 mm flat Phillips head screw S2116 3051 1 7 9 mm 5 16 in thick aluminum phenolic and stainless st...

Page 35: ...onic equipment WEEE According to these regulations any devices supplied after August 13 2005 in the business to business sphere to which this product is assigned may no longer be disposed of in munici...

Page 36: ...es 10 Flask clamp hardware 34 Flask clamp installation 19 Front view 9 Fuse replacement 25 I Indicators 13 13 K Keypad 13 M Main illustration 9 Mains power 11 Maintenance 25 Manual conventions 6 Measu...

Page 37: ...Index New Brunswick Innova 2000 2050 Shaker English EN 37 U Universal power module 11 Unpacking 17 Using this manual 5 V Voltages 17...

Page 38: ...Index New Brunswick Innova 2000 2050 Shaker English EN 38...

Page 39: ...cs and pictures Copyright 2013 by Eppendorf AG Declaration of Conformity Your local distributor www eppendorf com contact Eppendorf AG 22331 Hamburg Germany eppendorf eppendorf com ISO 9001 Certified...

Page 40: ......

Page 41: ......

Page 42: ...valuate Your Manual Give us your feedback www eppendorf com manualfeedback Your local distributor www eppendorf com contact Eppendorf AG 22331 Hamburg Germany eppendorf eppendorf com www eppendorf com...

Reviews: