NV-700I Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. A.5
8
Chapter 2.
Installing the Modem
Caution:
Please equip the anti-static devices during INSTALLATION.
2.1 Hardware Installation
This chapter describes how to install the modem, and establish the network connections. The NV-700I may be installed
on any level surface (e.g. a table or shelf). However, please take note of the following minimum site requirements
before you begin.
2.2 Pre-installation Requirements
Before you start the actual hardware installation, make sure you can provide the right operating environment, including
power requirements, sufficient physical space, and proximity to other network devices that are to be connected.
Verify the following installation requirements:
•
Power requirements:
12VDC ~ 48VDC / 17Watts or above power source.
•
The modem should be located in a cool dry place, with at least
10cm/4in
of space at the front and back for
ventilation.