Managed Stackable Layer 3 Switches GSM7328S, GSM7352S and GSM7328FS Hardware Instal-
Hardware Installation
3-3
v1.0, February 2007
4. Make sure that all items are present. See “Package Contents” on page 3-1.
5. Inspect the products and accessories for damage. Report any damage
immediately.
Installation
Install the equipment in the sequence presented in this chapter, as shown below:
1. Select a Location.
See “Select a Location” on page 3-4.
2. Install the Switch.
See “Install the Switch” on page 3-5.
3. Check the installation.
See “Check the Installation” on page 3-6
4. Apply power and check the LEDs.
See “Connect to Power and Check the LEDs” on page 3-6.
Note:
If any item is found missing or damaged, contact your local
NETGEAR reseller for replacement.