
2-1
v1.0, October 2008
Chapter 2
Hardware Installation
This chapter explains how to install the hardware for the Managed Stackable Layer 2+ Fast
Ethernet Switch models FSM7226RS and FSM7250RS.
Package Contents
Each switch is packed and shipped separately. The package contains the following items:
•
Managed Stackable Layer 2+ Fast Ethernet Switch with preinstalled software
•
Power adapter cord
•
Rubber footpads for tabletop installation
•
Rubber caps for the SFP sockets
•
Rack-mounting kit
•
Stack cable
•
Null-modem serial cable (RS-232) with 9-pin connectors
•
Resource CD
: The CD contains
–
Configuration software
–
Documentation including the
Command Line Interface Reference for the ProSafe 7200RS
Series Layer-2 Stackable Switches
, the
NETGEAR 7000 Series Managed Switch
Administration Guide
,
the NETGEAR Installation Guide for the 7000 Series Stackable
Managed Switch
, and this
Hardware Installation Guide
•
Warranty and Support Card
•
ProSafe NMS100 Network Management System 30-day trial CD-ROM