![NetApp FAS8300 Manual Download Page 44](http://html.mh-extra.com/html/netapp/fas8300/fas8300_manual_1669893044.webp)
cluster_B::> metrocluster show
Cluster Configuration State Mode
-------------------- ------------------- ---------
Local: cluster_B configured switchover
Remote: cluster_A configured waiting-for-switchback
The switchback operation is complete when the clusters are in the
normal
state.:
cluster_B::> metrocluster show
Cluster Configuration State Mode
-------------------- ------------------- ---------
Local: cluster_B configured normal
Remote: cluster_A configured normal
If a switchback is taking a long time to finish, you can check on the status of in-progress baselines by using
the
metrocluster config-replication resync-status show
command.
6. Reestablish any SnapMirror or SnapVault configurations.
Step 8: Complete the replacement process
After you replace the part, you can return the failed part to NetApp, as described in the
RMA instructions shipped with the kit. Contact technical support at
, 888-
463-8277 (North America), 00-800-44-638277 (Europe), or +800-800-80-800
(Asia/Pacific) if you need the RMA number or additional help with the replacement
procedure.
Chassis
Replace the chassis - FAS8300 and FAS8700
All other components in the system must be functioning properly; if not, you must contact
technical support.
• You can use this procedure with all versions of ONTAP supported by your system.
• This procedure is disruptive. For a two-node cluster, you will have a complete service outage and a partial
outage in a multi-node cluster.
Shut down the controllers - FAS8300 and FAS8700
Option 1: Most configurations
You must shut down the node or nodes in the chassis prior to moving them to the new
chassis.
About this task
42