Nedap PowerRouter Installation Manual Download Page 18

EN

18

Appendix C   Technical Specifications

grid 

     

Continuous output power at 40 °C (P nom) 

 

AC 

output 

current 

    

AC output voltage (nominal) 

 

 

 

AC 

output 

range 

    

Protection 

     

Standby 

losses 

    

User 

interface 

    

Connectivity 

    

Backup switch over time 

 

 

 

Solar 

     

Max. 

Input     

No. 

of 

strings 

    

No. of MPP trackers  

 

 

 

DC Disconnection switch 

 

 

 

Solar 

Voltage 

    

MPP 

Voltage 

    

Solar 

Connections 

    

Max. Efficiency 

 

 

 

 

Max. MPP Efficiency  

 

 

 

Battery 

     

Output charge current
      
Battery 

types 

    

Battery voltage output range (Vout) 

 

 

Battery 

capacity 

    

Charging 

curve 

    

Short circuit protection 

 

 

 

Multipurpose 

relay 

    

Battery temperature compensation 

 

 

Battery voltage sense 

 

 

 

Current 

shunt 

    

Environmental 

    

Operating Temperature Range (full power) 

 

Storage 

Temperature    

Humidity 

     

Regulatory Approvals and Standards 

 

 

Safety 

     

Emission 

     

Immunity 

     

Anti Islanding Protection
      
Warranty 

     

general 

     

Dimensions 

(WxHxD)    

Protection 

Category 

    

Weight 

     

Topology 

     

Cooling 

     

PR50SB-BU 

PR37SB-BU 

PR30SB-BU  

5000 W (4600 W DE) 

3700 W 

3000 W 

 

22A 

16A 

13A  

230 Vac ± 2%, 50 Hz ± 0.2%, true sine wave <3% THD, single phase 

 

180-264 Vac 45-55 Hz (limited by local anti-islanding regulations) 

 

electronic, fused 

 

 

 

≤ 6W 

 

 

 

interactive display with 4-button operation 

 

 

ethernet RJ45, TCP/IP 

 

 

 

<1 second

 

 

  

PR50SB-BU  PR37SB-BU PR30SB-BU 

 

5.5 kWp and 15 A per string  4 kWp and 15 A per string  3.3 kWp 15 A   

1  

2, fully independent 

2, fully independent 

 

4-pole, 600V, 15A 

4-pole, 600V, 15A 

2-pole, 600V, 15A 

150 – 600 Vdc per string 

 

 

 

100 – 480 Vdc per string 

 

 

 

MC4 

 

  

94.5% 

 

  

99.9% 

 

  

PR50SB-BU  PR37SB-BU PR30SB-BU 

 

25 - 200 A continuous, 

25 - 155 A continuous, 

25 - 125 A continuous,

programmable 

programmable 

programmable  

Gel, AGM, NiCd, Li-ion 

 

 

 

18 – 32 Vdc 

 

 

 

min. 100 Ah, at 25A charge current 

 

 

float or 3-stage adaptive with maintenance 

 

 

electronic, at max. charge current, switch off <1 sec 

 

 

2 (NO/NC, 250 Vac, 1 A, 24 Vdc, 5 A) 

 

 

included 

 

  

included 

 

  

included 

 

  

PR50SB-BU  PR37SB-BU PR30SB-BU 

 

-10 °C to +50 °C (derating from 40 °C) 

 

 

-40 °C to +70 °C 

 

 

 

maximum 95%, non-condensing 

 

 

CE 

 

  

EN 60950-1, EN 62109-1, EN 60335-2-29 

 

 

EN 55014-1, EN 61000-3-2, EN 61000-3-3, EN 61000-6-3 

 

EN 55014-2, EN 61000-6-2   

 

 

VDE 0126.1.1, G83/1(UK), RD1663/2000(ESP), DK5940 E.d. 2.2 (IT), AS4777(AUS) 
(check www.PowerRouter.com for other country certifications) 

 

five years (optional: extension to ten years) 

 

 

PR50SB-BU  PR37SB-BU PR30SB-BU 

 

765 x 502 x 149 mm 

 

 

 

IP 21 

 

 

 

20.5 kg 

 

 

 

galvanic isolated transformer   

 

 

forced airflow 

 

 

 

Summary of Contents for PowerRouter

Page 1: ...the PowerRouter PowerRouter Solar Battery Installation Manual...

Page 2: ...tandby 1 2 3 4 x 4 x 2 x 2 x 4 5 6 Standby Standby Standby Standby Standby Standby Standby Standby min 300 mm min 800 mm Max 40 C Min 10 C i 20 KG A A A A A B B Drill template for the PowerRouter Dril...

Page 3: ...C LOCAL OUT AC GRID USB ETHERNET RJ45 CAN BUS CAN NO NO NC NC AC GRID AC LOCAL OUT 2 1 internet router PC laptop Mac to the router Cat5 network cable of a suitable length the PowerRouter to the router...

Page 4: ...Settings menu Service menu Status menu System Reset Selftest Errors Install Wizard Display Date Time Language Battery Solar Grid Battery Solar Grid Internet connections 13 14 YES NO ON OFF Operationa...

Page 5: ...te 20 Manuel d installation Page 34 Installatie handleiding Bladzijde 48 Manuale d installazione Pagina 62 Manual de instalaci n P gina 76 Manual de instala o P gina 90 N V Nederlandsche Apparatenfabr...

Page 6: ...formation that you should know and use to ensure optimal operation of the system A bullet with a number refers to an illustration with the same number For illustrations refer to pages 2 4 Contents To...

Page 7: ...e into account the following guidelines cautions and warnings when choosing a mounting location for the PowerRouter The PowerRouter is designed for indoor installations IP21 Do not install the PowerRo...

Page 8: ...n in a safe and efficient manner follow the steps in the right order Before wiring the PowerRouter make sure that all wires connected to the PowerRouter are not live by turning off all disconnects and...

Page 9: ...PowerRouter Read the label on the battery Battery charging stations must be located in designated battery charging areas This is because of the dangers of hydrogen gas and battery acid Do not smoke or...

Page 10: ...e with the install wizard and installation software tool see also clause 6 2 The left contacts can be used for grid alarms the right contacts can be used for battery alarms 5 Commissioning This chapte...

Page 11: ...or the end user depending on the configuration The restart duration is less than 1 minute Reset procedure 1 Enter the service menu 2 Select Reset 3 Press YES to continue 4 Press YES to start the Reset...

Page 12: ...ill not be used if fixed float charge characteristic is set 28 8 V when 3 stage is set 28 0 V 30 0 V Low battery alarm ON Low battery alarm relay will be activated if battery voltage falls below set v...

Page 13: ...outer to clear the error Also the error message can be cleared using the installation software tool or via the internet Clear error message procedure 1 Press NO for at least 3 seconds Troubleshooting...

Page 14: ...d in Appendix D Solar 8 Disconnect AC wiring Grid Load The PowerRouter can now be removed for disposal or repair Decommissioning should only be carried out by certified persons Contact your installer...

Page 15: ...or inappropriate operation insufficient ventilation of the unit failure to observe the applicable safety regulations force majeure e g lightning overvoltage storm fire cosmetic shortcomings which do...

Page 16: ...isconnects loads B004 S Battery temperature too high measured by the external temperature sensor Check ambient temperature of battery storage room Provide sufficient cooling B005 S Battery temperature...

Page 17: ...upply voltages out of range D029 S Cold start failed D011 S Load voltage too low Check grid voltage D012 S Load voltage too high D013 H Load short circuit Check load D023 H Current overload Disconnect...

Page 18: ...anti islanding regulations electronic fused 6W interactive display with 4 button operation ethernet RJ45 TCP IP 1 second PR50SB BU PR37SB BU PR30SB BU 5 5 kWp and 15 A per string 4 kWp and 15 A per st...

Page 19: ...n the connector locking mechanism PV disconnection procedure 1 Insert PV MS tool with the pins to the connector 2 Pull the PV connector out of the PowerRouter This tool is not delivered with the Power...

Page 20: ...nformationen zu finden die f r einen optimalen Betrieb der Anlage anzuwenden sind Ein nummeriertes Aufz hlungszeichen weist auf eine Abbildung mit derselben Nummer hin Die Abbildungen befinden sich au...

Reviews: