10
Grid - configuring grid related settings
Country
Select the country in which the system will be installed.
Country-specific grid validation settings will be programmed
automatically, such as:
Anti-islanding - Frequency - Voltage - AC values
Grid limits
When enabled, country specific settings can be overruled. This
is only allowed only with specific permission from the energy
contractor.
EEG 2012*
When enabled, the system complies with the EEG2012 regulations
(in Germany) by limiting its grid output power to 70% of nominal
power by default. The limitation can be optimized by entering the
installed solar power capacity. The system will then limit its AC
output to 70% of the installed solar power capacity.
VDE4105*
Here you can change the reactive power settings as required
by your local utility company, when deviating from the standard
VDE4105 curve.
*Note: This setting is only applicable when the PowerRouter is
installed in Germany.
Figure 20: Country
Figure 21: Grid limits
Figure 22: EEG2012
Figure 23: VDE4105