CHAPTER 2 INSTALLATION
– 82 –
NWA-008853-001 Rev.3.0
97ch2001.fm
Example of MDF Cross Connection for M10 Card
1
2
3
4
RA
TA
26
27
28
29
RB
TB
LTC (J)
26
27
28
29
RB
TB
1
2
3
4
RA
TA
(P)
1 LTC3 CONNECTOR
9
10
11
12
RA
TA
34
35
36
37
RB
TB
LTC (J)
34
35
36
37
RB
TB
9
10
11
12
RA
TA
(P)
2 LTC3 CONNECTOR
17
18
19
20
RA
TA
RA
TA
42
43
44
45
RB
TB
RB
TB
LTC (J)
42
43
44
45
RB
TB
RB
TB
17
18
19
20
RA
TA
RA
TA
(P)
3 LTC1 CONNECTOR
INSTALLATION PROCEDURE FOR DIGITAL CCIS
Summary of Contents for UNIVERGE NEAX 2000 IPS
Page 1: ...NWA 008853 001 ISSUE 3 0 CCIS System Manual...
Page 14: ...vi NWA 008853 001 Rev 3 0 97toc001 fm THIS PAGE LEFT BLANK INTENTIONALLY...
Page 18: ...4 NWA 008853 001 Rev 3 0 97ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY...
Page 364: ...350 NWA 008853 001 Rev 3 0 97ch3005 fm THIS PAGE LEFT BLANK INTENTIONALLY JANUARY 31 2006...