CHAPTER 5 OPERATION TEST
– 421 –
NWA-008853-001 Rev.3.0
97ch5001.fm
STEP3:
Turn on the operating power. Confirm the state of the lamps on the two 24DTI/24CCT cards or
30DTI/30CCT cards. See the following tables.
• Alarm Indications on 24DTI
Page 422
• Alarm Indications on 30DTI
Page 423
• Alarm Indications on 24CCT
Page 425
• Alarm Indications on 30CCT
Page 427
STEP4:
With respect to channels assigned as trunks, perform call origination and call termination tests.
Prior to the performance test, make busy all trunks other than the test trunk by CME5.
Dial the trunk route access code and a station number. In the case of a loopback test, the same
BL lamp lights up on the calling side DTI/CCT card and the called side DTI/CCT card. At the
same time, the LPB lamp lights up on the called and calling side CCT cards. Talk with the called
side and confirm that there is no noise nor distortion. Perform this test from both digital and an-
alog stations if available.
STEP5:
Reassign the system data, as needed.
STEP6:
Turn off the operating power and disconnect the loopback test cable. Then, connect the trans-
mission line cable.
JANUARY/31/2006
LOOPBACK TEST
Summary of Contents for UNIVERGE NEAX 2000 IPS
Page 1: ...NWA 008853 001 ISSUE 3 0 CCIS System Manual...
Page 14: ...vi NWA 008853 001 Rev 3 0 97toc001 fm THIS PAGE LEFT BLANK INTENTIONALLY...
Page 18: ...4 NWA 008853 001 Rev 3 0 97ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY...
Page 364: ...350 NWA 008853 001 Rev 3 0 97ch3005 fm THIS PAGE LEFT BLANK INTENTIONALLY JANUARY 31 2006...