CHAPTER 4
NDA-24299
Page 52
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-13 Examples of Ethernet Cable Connection-FCH in PIM0 (1-IMG System) (2/2)
AT TE NT IO N
Contents
Static S ensitive
Handling
Precautions Required
0 6
04 0 5
03
0 2
0 1
00
0 6
04 0 5
03
0 2
0 1
00
CN
CN
CN
CN
HUB
CN
CN
HUB
BA S E U
P IM 1
P IM 2
P IM 3
U TP C TG 5 S T C A -J
P IM 0
L P M
TO P U
FA N U
B S C M
CN
FC
H
CN
U TP C T G 5 S T C A -J
FC
H
CN
CN
U T P C TG 5 S T C A -D
<F C H in P IM 0 (P attern 3)>
< FC H in P IM 0 (P a ttern 4)>
06
0 4 0 5
03
02
0 1
0 0
06
0 4 0 5
03
02
0 1
0 0
CN
C
N
CN
CN
CN
CN
CN
U T P C T G 5 S T C A -J
CN
F
C
H
HU
B
CN
CN
HU
B
B AS E U
P IM 1
P IM 2
P IM 3
L P M
CN
CN
TO P U
FA N U
P IM 0
CN
FC
H
CN
U T P C T G 5 S T C A -D
U TP C TG 5 S T C A -J
B S C M
Note:
When dual LANIs are used in both slot 00 and 03 of OPR (Pattern 3 or 4), be sure to use at least two
HUB cards: One HUB for internal LANI (in slot 00) and the other for external LANI (in slot 03).
However, if this is the case, and FCH is also in a dual configuration, the 10 BASE-T “cross” connection
between the HUBs is not required.