NDA-24299
CHAPTER 4
Page 57
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-16 Examples of Ethernet Cable Connection-FCH in PIM3 (1-IMG System) (2/2)
AT T EN T IO N
C o nte nts
S tatic S en s itiv e
H a nd ling
P re c au tio ns R eq uired
06
04 05
03
02
01
00
06
04 05
03
02
01
00
CN
CN
CN
CN
HU
B
CN
CN
HU
B
BA SE U
P IM 1
P IM 2
PIM 3
U TP C TG 5 S T C A -J
P IM 0
LPM
F AN U
B SC M
B SC M
CN
FC
H
CN
U TP C TG 5 S T C A-J
FC
H
CN
CN
U TP C TG 5 S T CA -N
T O PU
06
04 05
03
02
01
00
06
04 05
03
02
01
00
CN
CN
CN
CN
CN
CN
UTP C TG 5 S T C A -J
CN
FC
H
HU
B
CN
HU
B
BA SE U
P IM 1
P IM 2
PIM 3
LPM
CN
CN
F AN U
P IM 0
CN
FC
H
CN
U TP C TG 5 S T C A -N
U TP C TG 5 S T C A -L
U TP C TG 5 S T C A -J
T O PU
<FC H in P IM 3 (P atte rn 3)>
<F C H in P IM 3 (P a ttern 4)>
Note:
When dual LANIs are used in both Slot 00 and 03 of CPR (Pattern 3 or 4), be sure to use at least two
HUB cards: One HUB for internal LANI (in Slot 00) and the other for external LANI (in Slot 03).
However, if this is the case, and FCH is also in a dual configuration, the 10 BASE-T “cross”
connection between the HUBs is not required.