NDA-24299
CHAPTER 6
Page 155
Revision 1.0
POST INSTALLATION TEST
Fusion and Non-Fusion Connection Tests
STEP 2:
Lift the handset of STN A in self-node (Node A).
STEP 3:
Dial the telephone number of STN B that belongs to other node (STN B).
STEP 4:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5:
Replace the handset of STN A.
STEP 6:
Make idle all the trunks that were placed in make-busy state in STEP 1.
3.5.2
Alternate Route Trunk Test
STEP 1:
Using the MBCT command, make busy all trunks in the primary route.
STEP 2:
Using the MBCT command, make busy all trunks in the alternate route except the trunk to be tested.
STEP 3:
Lift the handset of STN A.
STEP 4:
Dial the telephone number of STN B.
STEP 5:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 6:
Replace the handset of STN A.
STEP 7:
Make idle all the trunks that were placed in make-busy state in STEP 1 and STEP 2.
Figure 6-12 FCCS Alternate Routing Test
4. Fusion and Non-Fusion Connection Tests
Use the following procedures and refer to
to perform the connection test between the FCCS and
non-Fusion Common Channel Interoffice Signaling (CCIS) or Associated Channel Interoffice Signaling
(ACIS):
4.1 When Seizing a Trunk from a Station
STEP 1:
Using the MAT command, make busy all trunks in the route except the trunk to be tested.
Check
Primary Route
FCC
S
FC
CS
STN A
TELN: 410000
STN: 2000
STN B
TELN: 420000
STN: 2000
Node A
(Self-Node)
Node B
Node C
Node D
Alternate Route
Check