CHAPTER 2
ND-70373 (E)
Page 8
Revision 1.0
INSTALLATION PROCEDURE
Connect CPR-related cables as shown in
Figure 2-4
and
Table 2-1
.
Figure 2-4 Cable Connections for IMG
x
BUS1A
PIM0
BZ-C10
PZ-PW92
BASEU
PZ-M371
LPR
BUS0A
PA0
PB0
BUS0
BUS1
PALM
PALM
CNA
CNB
CNA
CNB
PALM1
PALM0
PWRB1
PWRB0
PZ-GT17
PZ-GT17
PWRA1
PWRA0
OUT
PWR
IN
PWR
OUT
PWR
IN
PWR
CPR1
LPR
PIM0
CPR0
BASEU
[1]
[7]
[2]
[3]
[4]
[5]
[6]
[9]
[10]
[8]
Rear View
IMG0
Front View
IMG0
[1]~[5] : For system 0
[6]~[10]: For system 1
PZ-PW92