INSTALLATION PROCEDURE

2. Mounting of HFD

Mount the HFD in the CPR0. When the system is in redundant configuration, mount the HFD in the CPR1 in the
same manner. See 

Figure 2-2

.

Figure 2-2   Mounting of HFD

SW

MBR

CPU OPE

ON

OFF

5A

I

O

ON

OFF

OUTPWR

INPWR

0

1

2

3

4

5

6

WDT

GT0

GT1

GT2

GT3

SW

MBR

CPU OPE

ON

OFF

5A

I

O

ON

OFF

OUTPWR

INPWR

0

1

2

3

4

5

6

WDT

GT0

GT1

GT2

GT3

PBX

LPR

HFD PKG

Summary of Contents for NEAX 2400 ICS

Page 1: ...ND 70373 E ISSUE 1 SN1433 CPRAF A SN1435 CPRAH A Installation Guide JUNE 1998 NEC America Inc ...

Page 2: ... America Inc has prepared this document for use by its em ployees and customers The information contained herein is the property of NEC America Inc and shall not be reproduced without prior written approval from NEC America Inc NEAX and Dterm are registered trademarks of NEC Corporation Copyright 1998 NEC America Inc Printed in the U S A ...

Page 3: ... on CPU Board 4 CHAPTER 2 INSTALLATION PROCEDURE 5 1 Mounting of CPR 5 2 Mounting of HFD 6 3 Cable Connection for IMGx 7 4 IMGdxh 10 4 1 Cable Connection 11 4 2 Mounting of Additional GATE PZ GT19 Card 13 CHAPTER 3 SYSTEM STARTUP 17 1 Program Installation 19 1 1 Off Line Startup 19 1 2 HD Initialization 20 1 3 Basic Software Installation 21 1 4 Standard Service Software Installation 22 1 5 Lamp In...

Page 4: ...ng of CPR 5 2 2 Mounting of HFD 6 2 3 Locations of Connectors IMGx 7 2 4 Cable Connections for IMGx 8 2 5 Locations of Connectors IMGdxh 10 2 6 Cable Connections for IMGdxh 11 2 7 Removal of CPR 13 2 8 Removal of CPR Cover 14 2 9 Removal of Slot Cover 15 2 10 Mounting of GATE Card 16 3 1 EMA Card Mounting Location 17 3 2 Lamps and Switches on EMA Card Operation Panel 17 3 3 Operation Panel 18 3 4 ...

Page 5: ...70373 E LIST OF TABLES Page iii Revision 1 0 LIST OF TABLES Table Title Page 2 1 Cable Connections for IMGx 9 2 2 Cable Connections for IMGdxh 12 3 1 Abnormal Lamp Indication on Line Trunk Circuit Card 25 ...

Page 6: ...LIST OF TABLES ND 70373 E Page iv Revision 1 0 This page is for your notes ...

Page 7: ...SN1435 CPRAH A IMGdxh When two CPRs are mounted redundant dual configuration of the system is available Outer view of each CPR is shown in Figure 1 1 Figure 1 1 Outer View of CPR SW MBR MB CPU OPE HDD FDD ON OFF 5A I O ON OFF OUT PWR INPWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYS TEM SELECT 0 Note1 SW MBR MB CPU OPE HDD FDD ON OFF 5A I O ON OFF OUT PWR INPWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SY...

Page 8: ...t cards mounted in IMG0 PZ GT18 This card connects the CPU with the Local I O Bus HSW I O Bus and Misc Bus permitting the CPU to directly control the INT TSW HSW and other miscellaneous circuit cards mounted in IMG1 and IMG2 PZ GT19 This card connects the CPU with the Local I O Bus HSW I O Bus and Misc Bus permitting the CPU to directly control the INT TSW HSW and other miscellaneous circuit cards...

Page 9: ...hown in Figure 1 3 Figure 1 3 Internal Cable Connection Front View PZ PW92 KEY Above LEDA Below LEDB PZ GT19 for IMG3 PZ DK217 PZ IO27 PWR GOOD PZ GT17 for IMG0 CPU PZ GT18 for IMG1 IMG2 FAN FAN CA FAN LED LED LEDA LEDB 2P INT CA A 2P INT CA A IDE1 FDD DSPP 30AL ST FLT CA BZ M14 BWB DPWR IDEH FDFDD FDD IF CA HDD CABLE ...

Page 10: ...4 Revision 1 0 GENERAL 3 Switch Setting on CPU Board Factory setting of the jumper switches on the CPU board is shown in Figure 1 4 Figure 1 4 Jumper Switch Setting on CPU Board FREQ1 FREQ2 EP3 EP1 EP2 CLK1 CLK2 CPS FAN VR1 VR2 ...

Page 11: ...m is 4 IMG configuration an additional GATE card must be mounted in the CPR see 4 2 Mount the CPR in the LPR and secure it with four screws as shown in Figure 2 1 Figure 2 1 Mounting of CPR SW MBR MB CPU OPE HDD FDD ON OFF 5A I O ON OFF OUTP WR INPW R 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 SW MBR MB CPU OPE HDD FDD ON OFF 5A I O ON OFF OUT PWR INPWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYS TEM SELECT 0...

Page 12: ... the system is in redundant configuration mount the HFD in the CPR1 in the same manner See Figure 2 2 Figure 2 2 Mounting of HFD SW MBR CPU OPE ON OFF 5A I O ON OFF OUTP WR INPW R 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 SW MBR CPU OPE ON OFF 5A I O ON OFF OUTP WR INPW R 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 PBX LPR HFD PKG ...

Page 13: ...2 3 Locations of Connectors IMGx SW MBR MB CPU OPE HDD FDD ON OFF 5A I O ON OFF OUT PWR IN PWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYSTEM SELECT PZ IO27 PZ PW92 LPR 00 01 02 03 04 PZ GT17 PZ IO27 PZ GT17 CPR 1 CPR 0 SW MBR MB CPU OPE HDD FDD ON OFF I O ON OFF OUT PWR IN PWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYSTEM SELECT PZ PW92 E M A M I S C M I S C M I S C I O C A B A B 5A ...

Page 14: ...gure 2 4 Cable Connections for IMGx BUS1A PIM0 BZ C10 PZ PW92 BASEU PZ M371 LPR BUS0A PA0 PB0 BUS0 BUS1 PALM PALM CNA CNB CNA CNB PALM1 PALM0 PWRB1 PWRB0 PZ GT17 PZ GT17 PWRA1 PWRA0 OUT PWR IN PWR OUT PWR IN PWR CPR1 LPR PIM0 CPR0 BASEU 1 7 2 3 4 5 6 9 10 8 Rear View IMG0 Front View IMG0 1 5 For system 0 6 10 For system 1 PZ PW92 ...

Page 15: ...S CA A 3 SN1433 CPRAF A Front PZ PW92 IN PWR BASEU PZ M371 PA0 4P 2P PWR CA A 4 SN1433 CPRAF A Front PZ PW92 OUT PWR LPR BZ C10 PWRA0 6P 4P 3P PWR CA A PWRB0 5 SN1433 CPRAF A Front PZ PW92 PALM LPR BZ C10 PALM0 10AL 110 FLT CA 6 SN1433 CPRAF A Front PZ GT17 BUS CNB SLOT No 6 PIM0 BUS1A 50 40 GT BUS CA A 7 SN1433 CPRAF A Front PZ GT17 BUS CNA SLOT No 6 LPR BZ C10 BUS1 EXGT BUS CA A 8 SN1433 CPRAF A...

Page 16: ...FDD ON OFF I O ON OFF OUT PWR IN PWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYSTEM SELECT PZ IO27 PZ PW92 LPR 00 01 02 03 04 PZ GT17 PZ GT18 PZ IO27 PZ GT18 CPR 1 CPR 0 SW MBR MB CPU OPE HDD FDD ON OFF 5A I O ON OFF OUT PWR IN PWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYSTEM SELECT PZ PW92 PZ GT19 Note Note This GATE PZ GT19 card is used for IMG3 PZ GT19 Note PZ GT17 E M A M I S C M I S C M I S C I O...

Page 17: ...T19 CNA CNB CNA CNB PZ GT17 PZ GT19 IN PWR OUT PWR IN PWR OUT PWR CPR1 CPR0 BASEU 13 1 7 2 3 4 5 6 9 8 10 11 12 14 16 16 15 7 15 8 Front View IMG3 Front View IMG2 Front View IMG1 Front View IMG0 Rear View IMG0 1 8 For system 0 9 16 For system 1 CN CN Note Note D B C A A B C D Note Connect these cables referring to the table below LPR Label on the Cable Corresponding GATE Card CPR 0 CPU0 SLOT1 3 or...

Page 18: ...CPRAH A Front PZ GT18 BUS CNB SLOT No 5 IMG1 HSWM IOP0 68PH 50AL CA B Note 7 SN1435 CPRAH A Front PZ GT18 BUS CNA SLOT No 5 IMG2 HSWM IOP0 68PH 50AL CA B Note 8 SN1435 CPRAH A Front PZ GT19 BUS SLOT No 4 IMG3 HSWM IOP0 68PH 50AL CA C Note 9 SN1435 CPRAH A Front PZ GT17 BUS CNB SLOT No 6 PIM0 BUS1A 50 40 GT BUS CA A 10 SN1435 CPRAH A Front PZ GT17 BUS CNA SLOT No 6 PIM0 BZ C10 BUS1 EXGT BUS CA A 11...

Page 19: ...ation an additional GATE card must be mounted in the CPR This sec tion explains the procedure for mounting the additional GATE card 1 Removal of CPR Remove the CPR0 from the LPR as shown in Figure 2 7 Figure 2 7 Removal of CPR SW MBR CPU OPE ON OFF 5A I O ON OFF OUT PWR INPWR 0 1 2 3 4 5 6 WDT GT0 GT1 GT2 GT3 ON SYS TEM SELECT 0 Note1 PBX LPR ...

Page 20: ...OCEDURE 2 Removal of CPR Cover Remove the front cover right side only and the top cover as shown in Figure 2 8 Figure 2 8 Removal of CPR Cover GT0 MBR GT2 WDT GT1 GT3 CPUOPE SYSTE M SELECT ON ON OFF 1 2 3 4 5 6 0 SW ON OFF 5A MB HDD FDD OUT PWR IN PWR ON OFF ...

Page 21: ...1 0 INSTALLATION PROCEDURE 3 Removal of Slot Cover Remove the cover of Slot 4 on the front cover as shown in Figure 2 9 Figure 2 9 Removal of Slot Cover Slot 4 Front Cover GT0 MBR GT2 WDT GT1 GT3 CPUOPE SYSTEM SELECT ON ON OFF 1 2 3 4 5 6 0 ...

Page 22: ...l GATE card to Slot 4 on the CPU board as shown in Figure 2 10 Figure 2 10 Mounting of GATE Card 5 Mounting of Cover Mount the removed covers again refer to Figure 2 8 6 Mounting of CPR Mount the extracted CPR in the LPR again refer to Figure 2 7 SW ON OFF 5A MB HDD FDD OUT PWR IN PWR ON OFF GATE Card Slot 4 ...

Page 23: ...related to program installation are shown in Figure 3 1 through Figure 3 3 Figure 3 1 EMA Card Mounting Location Figure 3 2 Lamps and Switches on EMA Card Operation Panel EMA Card Operation panel 1 Operation panel 0 IMG0 01 02 03 04 00 OPE MB MB PKG NO STATUS EMA SUP EMA SUP ACT1 CPU1 RST CPU0 RST SENSE1 SENSE0 ACT0 Not used CPU SEL CKERR1 CKERR0 ...

Page 24: ...CHAPTER 3 ND 70373 E Page 18 Revision 1 0 SYSTEM STARTUP Figure 3 3 Operation Panel OPE MB MB PKG NO STATUS EMA SUP EMA SUP ACT1 CPU1 RST CPU0 RST SENSE1 SENSE0 ACT0 Not used CPU SEL CKERR1 CKERR0 ...

Page 25: ...ning OFF the System 0 and repeat the above steps 1 1 Off Line Startup Off Line Startup HD Initialization Basic Software Installation Standard Service Software Installation ATTENTION Contents Static Sensitive Handling Precautions Required END START Status change of 7 Segment LED on the EMA card Startup end off line mode Turn Power SW ON Set the SENS switch for the system to be initial ized CPU0 CPU...

Page 26: ...te enable permit position on the Basic Software 1 FD Note system to be initialized CPU0 CPU1 to 1 on the EMA card Format Slide the write protect tab is set to write inhibit protect position on the Basic Software 1 FD Note Removal or Make Busy of the HFD card is not allowed while the Floppy Disk or Hard Disk is being accessed WARNING SENS SW 7SEG LED FUNCTION 6 3 4 1 HD FORMAT COPY FD MAKING DIRECT...

Page 27: ...ation on the EMA card END START Set the SENS switch corresponding to the system to have DATA installed CPU0 CPU1 to 3 on the Insert the FD Basic Software 2 into the FDD Repeat Basic Software 3 Last FD Install End EMA card Removal or Make Busy of the HFD card is not allowed while the Floppy Disk or Hard Disk is being accessed WARNING Flip the MBR key on the CPR DOWN UP DOWN ...

Page 28: ...oftware Make sure the write protect tab is set to write enable permit position on the Standard Service system to have DATA installed CPU0 CPU1 to 3 on the EMA card Slide the write protect tab to write inhibit protect position on the Standard Service Software FD Note Software FD Note into the FDD Removal or Make Busy of the HFD card is not allowed while the Floppy Disk or Hard Disk is being accesse...

Page 29: ...ment The procedure for checking lamp indication and system message is shown below 1 Confirm that no alarm lamps Red are illuminating on the Top Unit TOPU For explanations about TOPU lamp indications refer to the System Operations Manual 2 Check lamp indications on control circuit cards See Figure 3 4 3 Check lamp indications on each line trunk circuit card light as follows OPE lamp Green ON BL lam...

Page 30: ... 01 02 03 04 E M A ACT1 ACT0 OPE WDT WDT Note Note CPR1 CPR0 Note Each GT lamp flashes when the corresponding IMG stack is connected The relationship between the GT lamp and IMG stack is shown in the table below IMG STACK GATE CARD LAMP NAME GT0 GT1 GT2 GT3 PZ GT17 PZ GT18 PZ GT18 PZ GT19 IMG0 IMG2 IMG3 lights when the system 0 is in ACT state lights when the system 1 is in ACT state flashes regar...

Page 31: ... ATRK for all the lines trunks is not assigned The circuit card is faulty Note The OPE lamp lights green but the BL lamp for a line lights or flashes red on a line trunk circuit card The MB key for the line is set to ON UP The line is placed in make busy state by MBST MBTK command Station data ASDT trunk data ATRK is not assigned The circuit card is faulty Note The OPE lamp is OFF on all the line ...

Page 32: ...CHAPTER 3 ND 70373 E Page 26 Revision 1 0 This page is for your notes ...

Reviews: