![background image](http://html1.mh-extra.com/html/nec/express5800-r120g-2m/express5800-r120g-2m_user-manual_3944086120.webp)
1. Installing Internal Optional Devices
Express5800/R120g-2M User’s Guide
120
Chapter 2 Preparations
1.28
Installing Front Bezel
When installing Front Bezel, set it in the correct position and push it straight. After installing Front Bezel, lock it
with Bezel Lock Key.
Important Be careful not to press the POWER Switch.