![background image](http://html1.mh-extra.com/html/nec/express5800-320ma/express5800-320ma_planning-manual_3899134044.webp)
Site Planning for Systems in an ftGateway Group
6-4
Express5800/320Ma: Site Planning Guide
system management adapters used in earlier models of
Express5800/320Ma systems.
Make sure that only layer 1 and layer 2 devices separate the gateway and slave
systems. During a connection, the gateway system assigns the slave system a
temporary IP address from an IP address range reserved by NEC Solutions (America),
Inc. and uses that address for all traffic.
Summary of Contents for Express5800/320Ma
Page 1: ...NEC Solutions America Inc NR573 Express5800 320Ma Site Planning Guide...
Page 10: ...Preface x Express5800 320Ma Site Planning Guide...
Page 18: ...System Documentation 1 8 Express5800 320Ma Site Planning Guide...
Page 40: ...Connecting a System Directly to a UPS 5 6 Express5800 320Ma Site Planning Guide...
Page 50: ...Sample PDU Usage Calculation 7 6 Express5800 320Ma Site Planning Guide...
Page 77: ...Standards Compliance Standards Compliance C 3 VCCI Note BSMI Note...
Page 78: ...Standards Compliance C 4 Express5800 320Ma Site Planning Guide...