![NEC 2400 Integration Manual Download Page 51](http://html1.mh-extra.com/html/nec/2400/2400_integration-manual_3926123051.webp)
Issue 2 December 1995
4-9
Connect the SID to the INTUITY System
Connect the SID to the INTUITY
System
This task requires you to connect the 6’ RS-232 cable to the SID and to the
INTUITY System and should be completed by the AT&T installation technician.
The cable connects directly to the SID and connects to the INTUITY system
through a 6-to-25-pin adaptor and a modular cable. Use the following
instructions to connect the SID to the INTUITY System.
1. Connect the 25-pin RS-232 connector to Link A on the back of the SID.
Figure 4-3 shows you the location of Link A.
2. Connect the 25-pin end of the 6-to-25-pin adaptor to the free end of the
RS-232 cable.
NOTE
:
If you are connecting the SID to a MAP/5 through the COM1 port,
you do not need the adaptor. Connect the free end of the RS-232
cable to the COM1 port.
3. Plug the modular cable into the 6-to-25-pin adaptor.
4. Plug the free end of the modular cable into the multiport serial card in the
MAP/5, MAP/40, or MAP/100 platform.
Proceed to the next section.
Connect the SID Power Cord
The AT&T installation technician or the customer must complete this task.
1. Plug the female end of the power cord into the AC power-in socket on the
SID, shown in Figure 4-3.
2. Plug the male end of the power cord into the AC outlet provided by the
customer.
3. Locate the power switch on the back of the SID, shown in Figure 4-3.
4. Toggle the power switch to the
ON
position.
When you turn on the power switch, the Status LED on the front of the SID
illuminates.
You have completed the hardware installation steps required for the NEAX 2400
integration. Proceed to Chapter 5, "Installing SID Software on the INTUITY
System", in this document.
Summary of Contents for 2400
Page 2: ...Blank Page...
Page 8: ...Contents viii Issue 2 December 1995...
Page 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics...
Page 42: ...3 6 Issue 2 December 1995 Switch Integration Planning...
Page 52: ...4 10 Issue 2 December 1995 Hardware Installation...
Page 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration...
Page 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration...
Page 122: ...A 10 Issue 2 December 1995...
Page 128: ...B 6 Issue 2 December 1995...