Contents
Issue 2 December 1995
v
6
Administering the INTUITY System
for the NEAX Integration
6-1
■
Administering the Switch Link Administration Screen
6-2
■
Stopping and Restarting the Voice System
6-6
■
Administering the System Translation Screen
6-7
7
NEAX 2400 Switch Administration
7-1
■
Administer Analog Voice Mail Ports
7-2
■
Assign Voice Mail Extensions to a UCD Group
7-6
Setting Up a UCD Overflow Group
7-8
■
Configuring the Message Center Interface Link
7-10
Administer the Message Waiting Lamp
7-10
Assign a Port for the Message Center
Interface Link
7-13
Define the Port as a Terminal
7-15
Assign the MCI Link to a UCD Group
7-16
8
Switch Integration Device Administration
8-1
■
Administer the Basic Parameters
8-2
■
Assign Extensions and LTNs
8-4
Using AutoFill
8-5
■
Saving and Starting the Configuration
8-7
■
Administer Serial Data Links
8-8
■
Changing System Parameters
8-11
Setting the Date and Time
8-11
Adjusting the LCD Contrast
8-12
■
Special Processing for Message Waiting Lamps
8-13
■
Setting a Security Level
8-14
Summary of Contents for 2400
Page 2: ...Blank Page...
Page 8: ...Contents viii Issue 2 December 1995...
Page 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics...
Page 42: ...3 6 Issue 2 December 1995 Switch Integration Planning...
Page 52: ...4 10 Issue 2 December 1995 Hardware Installation...
Page 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration...
Page 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration...
Page 122: ...A 10 Issue 2 December 1995...
Page 128: ...B 6 Issue 2 December 1995...