Refer to the table below for a rough indication and
consult a professional installer for a safe installation.
16.SYSTEM OPERATION CHECK
After the
POWER
SERVICE
PSB
installation, an
operation test is required. The leisure battery must be
at 75% of the capacity, so please use the battery with
some appliances to reach the required State Of Charge.
ALTERNATOR CHARGING CHECK-UP
1. Turn off the engine.
2. Use a voltmeter to check the leisure battery voltage.
3. Check if the Dip-Switch combination for the battery
requirements (Chapter. 8) and for the alternator’s
type (traditional or smart) are correct.
4. Turn on the
POWER
SERVICE
PSB
switch to position
1 (Ref. L).
23
PSB model
MINIMUM CABLE SECTION
l
≤
2 m
Input/Output
2m < l
≤
4 m
Input/Output
l > 4 m
Input/Output
PSB 12-40
16mm
2
/ 16mm
2
25mm
2
/ 25mm
2
35mm
2
/ 35mm
2
PSB 12-80
35mm
2
/ 35mm
2
50mm
2
/ 50mm
2
100mm
2
/ 100mm
2
PSB 24-30
16mm
2
/ 10mm
2
25mm
2
/ 16mm
2
35mm
2
/ 25mm
2
PSB 24-60
35mm
2
/ 25mm
2
50mm
2
/ 35mm
2
100mm
2
/ 50mm
2
PSB 12/24-20
25mm
2
/ 16mm
2
35mm
2
/ 16mm
2
100mm
2
/ 25mm
2
PSB 12/24-40
35mm
2
/ 16mm
2
50mm
2
/ 25mm
2
100mm
2
/ 35mm
2
PSB 24/12-40
16mm
2
/ 16mm
2
25mm
2
/ 25mm
2
35mm
2
/ 35mm
2
PSB 24/12-80
35mm
2
/ 35mm
2
50mm
2
/ 50mm
2
100mm
2
/ 100mm
2