background image

15. FAQ 

1. What is the maximum voltage supported for solar 

panels?

 

power

service

 units support a maximum voltage of 28V.

 

2. HOW  MUCH  CURRENT  DOES  THE  power

service

  UNIT 

CONSUME?

 

13,0

m

A

.

 

3. it  is  possible  to  recharge  the  starting  battery  with 

the power

service

?

 

currently  it  is  not  possible  to  recharge  the  engine  battery, 
only the service batteries. The engine battery is not charged 
by  the 

power

service

,  even  if  the  device  is  connected  to  the 

mains power supply electricity mains power supply or to the 
solar panel. PLEASE ASK YOUR INSTALLER OR SUPPLIER FOR ADVICE. 

4. sometimes  the  VOLTAGE  AT  THE  LEISURE  BATTERY  rises 

above 15.8/16V, is this normal?

THIS IS normal during the desulfation phase. 

 

5. How long is the desulfation phase?

 

desulphation  has  a  variable  duration,  depending  on  the 
length of the general charge. It can last up to 2 hours

6. it  is  possible  to  connect  a  remote  control  to  the 

power

service

?

 

no,  it  is  not  possible  to  use  a  remote  control  to  control  or 
display the functioning of the 

power

service

. We recommend 

using THE NDS i-manager device to get all the information on 
the battery charge status

7. can  a  solar  panel  be  connected  to  the  power

service

 

or is another device needed?

 

no  intermediate  device  is  required,  the 

power

service

 

incorporates a PWM charge controller, so you only need to 
connect the panel to terminal 7

 38

Summary of Contents for POWERSERVICE PLUS 25

Page 1: ...1 powerservice user manual Plus 25 plus 30 Plus 40 plus 40 l plus 12 24 20 plus 24 24 20 Gold 25 M gold 30 m gold 40 m gold 40 m l gold 12 24 m gold 24 24 m Gold plus Valid for the following models...

Page 2: ...ding to the local waste disposal roules do not dispose of old products with normal household waste The proper disposal of products that can no longer be used prevents potential negative consequences f...

Page 3: ...ons 7 4 operation 8 5 led indicators 10 6 charging curves 11 7 connections 14 8 installation 16 9 wiring diagrams 18 10 Checking the system s operation 23 11 MAintenance 25 12 fuse replacement 26 13 t...

Page 4: ...he vehicle s fuel system must be in good condition in case of damaged connecting cables or inadequate section immediately replace them with suitable cables as specified by this manual or by a qualifie...

Page 5: ...rtain measuring instruments are essential for a correct installation Multimeter with continuous voltage measurement 20V scale or autoscale and continuity measurement clamp meter with DC current measur...

Page 6: ...power making the most of all available sources of energy on a motorhome or campervan powerservice includes two advanced models tailored for the modern recreational vechicles needs plus charger dc dc c...

Page 7: ...ated only if necessary and the rotation speed is electronically controlled according to the temperature inside the device keeping fan noise to minimum 3 1 protections powerservice units are equipped w...

Page 8: ...th a voltage higher than 13 3V 26 6V for 24 24 versions the powerservice will start charging the service batteries During charging the voltage of the starter battery will be constantly monitored to ch...

Page 9: ...ops charging using the solar controller when the panel voltage becomes lower than the service battery there is not enough light to sustain a charging current POWER SUPPLY FROM 230V MAINS CONNECTION GO...

Page 10: ...rce of incoming charge and the charge phase that the device is using the charging phase in progress is shown with a corresponding number of flashes on the relevant LEDs 10 plus gold Nota all the led s...

Page 11: ...tems with smart alternators and LiFePO4 lithium batteries The charge curves are selectable using two jumpers 11 yes no Model 12V 24V max voltage 14 8V 29 6V float voltage 13 8V 27 6V max desulfation v...

Page 12: ...tem wait until the end of the procedure Model 12V 24V max voltage 14 5V 29V float voltage 13 5V 27V max desulfation voltage not allowed C curve generic curve flooded LiFePO4 d curve generic curve for...

Page 13: ...NDICATORS will emit flashes corresponding to the charging phase being used at the time the various phases are indicated at the base of the above graphs A B curve agm gel C D curve flooded LiFePO4 Vmax...

Page 14: ...l line 5 AUX connection of the existing control unit sargent schaudt etc 6 output of the charger connects to the positive terminal of the service battery 7 solar panel direct connection 12V nominal ma...

Page 15: ...ition signal line is not active engine off the appliance will be powered by the service battery When the engine is running the internal relay will switch on the AUX and the loads will be powered direc...

Page 16: ...a vertical wall it is recommended to keep the short side parallel to the floor with connections downwards Do not install the device close to sources of heat or in a place that is not adequately venti...

Page 17: ...l system safety switch rcd switch to avoid interferences in audio video systems use high quality and in good condition cables for TV antennas and other transceivers make sure that the powerservice s p...

Page 18: ...m2 cables installation in vehicle with no control unit or split charge relay in this case for ordinary vehicles to be transformed to RV or vehicles that need an auxiliary battery the powerservice can...

Page 19: ...ng control unit parallel relay for the control unit we mean the unit of control and distribution of energy on the HABITATION PART of the vehicle Eg CBE ds300 Schaudt EBL163 nord elettronica ne287 SARG...

Page 20: ...ers use 16mm2 cables installation with split charge relay only the parallel relay refers to the pre existing relay which when the vehicle engine is switched on makes the connection between the service...

Page 21: ...21 For cables longer than 2 meters use 16mm2 cables Plus and Gold 12 24 m installation in vehicle with 12V alternator and 24V service Leisure batteries...

Page 22: ...han 2 meters use 16mm2 cables installation with i manager in systems with two leisure batteries the powerservice output must be connected to the common positive of the i manager in order to supply the...

Page 23: ...mum current of the POWER SERVICE UNIT this phase could last a few seconds if the service battery is completely charged 6 With a multimeter measure the voltage on the starter battery poles then measure...

Page 24: ...ays be left in the ON position 1 for normal operation If the switch is set to OFF 0 the powerservice is disabled only from the Alternator charge source then it continues to operate from the solar pane...

Page 25: ...tinue operating properly we periodically recommend Clean externally to prevent accumulation of dust and dirt Check that the input connections and the battery poles are tight and SECURE Make sure that...

Page 26: ...t feature fuse protections for each of the input and output terminals To access the DC part fuse you must unscrew 4 side screws 2 on each side and lift the front cover taking care not to DAMAGE the wi...

Page 27: ...blade fuse univaL type 6 solar panel line pin n 7 non for 24V output models 25a blade fuse univaL type 7 main power supply iec socket only gold series 10a glass type 5x20 fuse NOTe all the connection...

Page 28: ...auses All the LEDs flash 5 times accompanied by the sound of the buzzer pause again flash and sound Fuse failure related to the cable connected to the output solar panel voltage too high electronic bo...

Page 29: ...m2 min section 2 check the connections on terminals 1 2 3 and 6 3 connect the cable attached to terminal 1 directly to the negative pole of the engine battery or services 4 cable attached to terminal...

Page 30: ...input sources Recommended power Alternator 70A 90A 110A solar panel 250W nominal output voltage 12V output voltage range 11V 16V battery output numbers 1 max charging current Alternator 25A 30A 40A so...

Page 31: ...12 4V and d on solar panel vp 16V and d off Deactivation threshold Alternator vm 12 8V or d off Smart alternator vm 11 8V or d off solar panel vp vbs or d on connections 7 pole screw terminal block st...

Page 32: ...panel input sources Recommended power Alternator 110A solar panel nominal output voltage 12V 24v output voltage range 22V 32V battery output numbers 1 max charging current Alternator 20A solar panel g...

Page 33: ...12 4V and d on vm 24 8V and d on solar panel Deactivation threshold Alternator vm 12 8V or d off vm 25 6V or d off Smart alternator vm 11 8V or d off vm 23 6V or d off solar panel connections 7 pole...

Page 34: ...Hz Maximum input voltage Alternator 28A 34A 45A solar panel 15A Grid 3 5A input sources Recommended power Alternator 70A 90A 110A solar panel 250W Grid 450W nominal output voltage 12V output voltage r...

Page 35: ...yes Activation threshold Alternator Vm 13 3V and d on Smart alternator Vm 12 4V and d on solar panel vp 16V and d off grid Presenza rete and d off Deactivation threshold Alternator vm 12 8V or d off...

Page 36: ...r panel Grid 3 5A input sources Recommended power Alternator 110A 55A solar panel Grid 450W 450W nominal output voltage 24v output voltage range 22V 32V battery output numbers 1 max charging current A...

Page 37: ...solar panel grid grid available and d off Deactivation threshold Alternator vm 12 8V or d off vm 25 6V or d off Smart alternator vm 11 8V or d off vm 23 6V or d off solar panel grid grid unavailable...

Page 38: ...mes the VOLTAGE AT THE LEISURE BATTERY rises above 15 8 16V is this normal THIS IS normal during the desulfation phase 5 How long is the desulfation phase desulphation has a variable duration dependin...

Page 39: ...to the observance of the following norms EN55022 2010 EN55024 2010 A1 2015 EN61000 3 2 2014 EN61000 3 3 2013 Compliance for the restriction of the use of hazardous substances is demonstrated in compli...

Page 40: ...1000 3 2 2014 EN61000 3 3 2013 related to the electrical security BT Directive 2014 35 EU the conformity demonstrated to the observance of the following norms EN60335 1 2012 A11 2014 Compliance for th...

Page 41: ...ce returned even if under warranty will have to be shipped Freight paid and shall be returned and on a Freight collect basis The warranty certificate shall be valid only if accompanied by a official r...

Page 42: ...42 V 03 2018...

Page 43: ...43...

Page 44: ...rve all the energy you need NDS ENERGY s r l Via Pascoli 169 65010 Cappelle sul Tavo Pe Italy Tel 39 085 4470396 Cell whatsapp 39 373 8886 875 fax 39 085 9507049 web www ndsenergy it email commer ndse...