background image

"-"sign)   and   state   of   charge.  The   state   of   charge   (SOC)   is   indicated   by   coloured   lines
ranging from red, indicating that the battery is low, to green, indicating that the battery is
charged. 
The advanced 3Link BMS, when the alternator is operating, activates the battery charge
intelligently,   obtaining   maximum   current   up   to   75A   (depending   on   the   alternator
characteristics), resulting in a reduction of charging times, and therefore, greater autonomy
during stops. All without overloading the cell system, which is actually excluded when it is
charging, from the passing of current to the 3Lion.
The amount of current that can be charged to the battery is closely related to the type of
alternator installed on the vehicle. The higher its power, the greater the amount of current
that the 3Link can draw from it. Alternator powers below 120A are not recommended, as
the fast recharge of the battery will not be fully exploited. 
The charge by alternator is NOT active, if the vehicle is EURO6 with "Smart Alternator".
In this case it is necessary to follow the installation scheme "System with 3Lion+3link with
Smart  Alternator   (EURO6)"   and   select   the   checkbox   on   "Smart  Alternator"   from   the
"Settings" menu, as described below. 
Immediately after all connections have been made, the system starts up and the display
shows several screens for setting the system parameters as follows

SCREEN

MEANING AND FUNCTIONS

Setting the language.

 Click on the desired flag and then on the 

arrow to confirm your choice.

Setting the language. 

Click on the desired flag and then on the 

arrow to confirm your choice.

Setting the capacity.

 The number below the letter Ah indicates the 

capacity setting of the battery or the battery pack. Click on the 
keys 

until you reach the desired value. In the case of a battery

pack (i.e. multiple

 

3Lion

 batteries in parallel), enter the total 

capacity of the pack (that is, the sum of the Ah of each battery).

Summary of Contents for 3Lion 3L-100

Page 1: ......

Page 2: ...ion 3Link 2 SAFETY 3 INTRODUCTION 4 INSTALLATION 4 13Link INSTALLATION 4 2MOUNTING SCHEME 4 3DISPLAY INSTALLATION 5 OPERATION 5 1 CHARGE 5 2 DISCHARGE 6 OPERATION CHECK 7 VERIFIABLE PROBLEMS 8 TECHNIC...

Page 3: ...ith warm water and seek medical advice immediately Be careful when installing so that the two poles of the 3Lion do not come in contact with each other Use isolated equipment and do not place and or l...

Page 4: ...to the advanced energy system Lithium technology provides significant advantages over traditional lead batteries AGM GEL Free Acid For example it can withstand high charging currents with a very high...

Page 5: ...attery is disconnected from the system Prepare an area for housing the 3Link box as close as possible to the 3Lion and to the engine battery but never in the engine compartment or in compartments that...

Page 6: ...n i e the alternator is in operation and signal D is active Below there is a representation The installation of the 3Lion 3Link is very simple just intercept in the original system of the vehicle the...

Page 7: ...signal to the 3Link for an optimal operation of the device 1 2 3 3 4...

Page 8: ...n 2 of the 3Link the positive terminal of the 3Lion battery must have only one connection ending on the pin 3 of the 3Link Connections 03 04 05 and 06 are usually already present within the vehicle If...

Page 9: ...e the point references where the holes for the fixing screws diameter 3mm and the communication cable passage hole minimum diameter 7 2mm are to be made 3 Drill the holes and screw the back cover to t...

Page 10: ...malfunction Do not put the display in contact with other electrical devices Electrostatic discharges can cause malfunction Do not put the surface of the display in contact with water The touch screen...

Page 11: ...as the fast recharge of the battery will not be fully exploited The charge by alternator is NOT active if the vehicle is EURO6 with Smart Alternator In this case it is necessary to follow the install...

Page 12: ...ype The upper part of the screen allows to select the type of alternator Click on the checkbox which immediately after the click turns green if the vehicle is EURO6 with Smart Alternator Otherwise cli...

Page 13: ...r a full charge of the battery When the 3Lion is in charging mode a thunderbolt is displayed overlapping the coloured notches Pushing on the battery symbol the 3Lion battery indications change shape a...

Page 14: ...to the previous step of the system parameter setting sequence Allows you to change system settings If you press it briefly you can set the display mode If you press it for a long time you can set the...

Page 15: ...ries checking that the maximum voltage supplied by it does not exceed 14 5V The charger must NOT perform any desulfation action The use of battery chargers for flooded lead acid batteries although the...

Page 16: ...It is recommended to discharge the 3Lion battery with temperatures between 20 C e 60 C 6 OPERATION CHECK Once the system is installed you can test its functionality by performing the following tests...

Page 17: ...tolerance 10 7 VERIFIABLE PROBLEMS If the 3Lion battery has a voltage between 0V and 10V resulting voltage also detected on pins 2 and 3 of 3Link it may be possible that the BMS protection inside the...

Page 18: ...A 1C End of charge voltage 14 4V 0 2V 14 4V 0 2V 14 4V 0 2V 14 4V 0 2V Number of cycles estimated 80 DOD 2500 2500 2500 2500 Operating temperature discharge 20 C 60 C 20 C 60 C 20 C 60 C 20 C 60 C Ope...

Page 19: ...Battery tolerance voltage Engine battery 3Lion 5 Dimensions 125x123x47mm Weight 480g 3link box display dimensions 175x135h67mm Box weight including display and accessories 785g Technical characterist...

Page 20: ...together with the warranty card the customer receives this certificate to be filled out in every part by the seller The warranty certificate must be kept and filed for each dispute Failure to submit...

Page 21: ......

Page 22: ...ize the processing of my personal data under the Decree Law June 30 2003 N 196 customer s signature To be returned in enclosed envelope to NDS Energy s r l Via G Pascoli 169 65010 Cappelle sul Tavo Pe...

Page 23: ......

Page 24: ......

Reviews: