For connecting the cables to pins 1, 2 and 3 of the 3Link, it is strongly recommended that 
you use the terminals for M8 screws (DO NOT use the "fork" type) to ensure a perfect and 
secure connection between the cable and the contact of the 3link, as in the following figure.
The cable lug must be placed between the 3Link aluminium plate and the washer, just as 
shown in the figure below 

For connexions 01, 02 and 08, it is recommended to use 35mm 

2

 cross-section cables, if the

length of the connexion is less than or equal to 1 meter. If the length of the connexion 
exceeds 1 meter, it is recommended the use of cables with a cross-section of 50mm

2

. It is 

also advisable to install a 200A fuse on cables 01 and 08.
Tighten the terminals firmly to screws 1, 2, and 3 of the   3Link , with the supplied nuts and
washers. All the loads in the camper (battery chargers, inverters, solar panel regulators, 
lights, etc.) must be connected on the pin 2 of the 3Link, the positive terminal of the 3Lion 
battery must have only one connection ending on the pin 3 of the 3Link. 
Connections 03, 04, 05 and 06 are usually already present within the vehicle. If not present,
it is recommended to use cables with a section greater than or equal to 10mm 

2

 .

Connection 07 can be done with cable with cross-section between 1mm 

2

 and 2.5mm 

2

 .

As soon as the ground cable is connected to the 3Link, the system becomes operational. 

Charge completely just after installing the system or after doing any maintenance on
it otherwise the SOC on the display will not be real. When it is fully charged, the 
display will show 100% on the battery state of charge (SOC) display.

Close the 3Link cover by threading the two tabs on the back into the appropriate base seats;
tighten the 2 screws supplied into the holes at the front corners of the cover. 
When installing 2 3Lion batteries in parallel, use only one 3Link and place the 2 3Lion 
batteries in parallel with cables of a cross-action of at least 35mm

2

 and place them as close 

to each other as possible. Proceed with the installation as shown below.

Summary of Contents for 3Lion 3L-100

Page 1: ......

Page 2: ...ion 3Link 2 SAFETY 3 INTRODUCTION 4 INSTALLATION 4 13Link INSTALLATION 4 2MOUNTING SCHEME 4 3DISPLAY INSTALLATION 5 OPERATION 5 1 CHARGE 5 2 DISCHARGE 6 OPERATION CHECK 7 VERIFIABLE PROBLEMS 8 TECHNIC...

Page 3: ...ith warm water and seek medical advice immediately Be careful when installing so that the two poles of the 3Lion do not come in contact with each other Use isolated equipment and do not place and or l...

Page 4: ...to the advanced energy system Lithium technology provides significant advantages over traditional lead batteries AGM GEL Free Acid For example it can withstand high charging currents with a very high...

Page 5: ...attery is disconnected from the system Prepare an area for housing the 3Link box as close as possible to the 3Lion and to the engine battery but never in the engine compartment or in compartments that...

Page 6: ...n i e the alternator is in operation and signal D is active Below there is a representation The installation of the 3Lion 3Link is very simple just intercept in the original system of the vehicle the...

Page 7: ...signal to the 3Link for an optimal operation of the device 1 2 3 3 4...

Page 8: ...n 2 of the 3Link the positive terminal of the 3Lion battery must have only one connection ending on the pin 3 of the 3Link Connections 03 04 05 and 06 are usually already present within the vehicle If...

Page 9: ...e the point references where the holes for the fixing screws diameter 3mm and the communication cable passage hole minimum diameter 7 2mm are to be made 3 Drill the holes and screw the back cover to t...

Page 10: ...malfunction Do not put the display in contact with other electrical devices Electrostatic discharges can cause malfunction Do not put the surface of the display in contact with water The touch screen...

Page 11: ...as the fast recharge of the battery will not be fully exploited The charge by alternator is NOT active if the vehicle is EURO6 with Smart Alternator In this case it is necessary to follow the install...

Page 12: ...ype The upper part of the screen allows to select the type of alternator Click on the checkbox which immediately after the click turns green if the vehicle is EURO6 with Smart Alternator Otherwise cli...

Page 13: ...r a full charge of the battery When the 3Lion is in charging mode a thunderbolt is displayed overlapping the coloured notches Pushing on the battery symbol the 3Lion battery indications change shape a...

Page 14: ...to the previous step of the system parameter setting sequence Allows you to change system settings If you press it briefly you can set the display mode If you press it for a long time you can set the...

Page 15: ...ries checking that the maximum voltage supplied by it does not exceed 14 5V The charger must NOT perform any desulfation action The use of battery chargers for flooded lead acid batteries although the...

Page 16: ...It is recommended to discharge the 3Lion battery with temperatures between 20 C e 60 C 6 OPERATION CHECK Once the system is installed you can test its functionality by performing the following tests...

Page 17: ...tolerance 10 7 VERIFIABLE PROBLEMS If the 3Lion battery has a voltage between 0V and 10V resulting voltage also detected on pins 2 and 3 of 3Link it may be possible that the BMS protection inside the...

Page 18: ...A 1C End of charge voltage 14 4V 0 2V 14 4V 0 2V 14 4V 0 2V 14 4V 0 2V Number of cycles estimated 80 DOD 2500 2500 2500 2500 Operating temperature discharge 20 C 60 C 20 C 60 C 20 C 60 C 20 C 60 C Ope...

Page 19: ...Battery tolerance voltage Engine battery 3Lion 5 Dimensions 125x123x47mm Weight 480g 3link box display dimensions 175x135h67mm Box weight including display and accessories 785g Technical characterist...

Page 20: ...together with the warranty card the customer receives this certificate to be filled out in every part by the seller The warranty certificate must be kept and filed for each dispute Failure to submit...

Page 21: ......

Page 22: ...ize the processing of my personal data under the Decree Law June 30 2003 N 196 customer s signature To be returned in enclosed envelope to NDS Energy s r l Via G Pascoli 169 65010 Cappelle sul Tavo Pe...

Page 23: ......

Page 24: ......

Reviews: