NCR RealScan 7875-7000/8000 Installation Guide
AIP-00342 Release B
06/03
19 of 56
Step 4 – Install RealScan 7875
Install RealScan 7875
Note:
Refer to the
NCR FastLane 7342 Hardware Installation Guide
(B005-0000-1370) for the
most current information about how to install a RealScan 7875-7000/8000 and the Sensormatic
components into an NCR FastLane checkstand.
1.
Grasp the RealScan 7875 as shown and lower it into the checkstand cutout. Be careful not to
damage any of the cables.
Note:
It is important that the RealScan 7875 does not rock on its supports. Make sure that
all adjustable supports are securely fastened and that the RealScan 7875 is sitting on all
supports.
20590D
2.
After the unit is properly sitting on its supports, install the Produce Guard if one is present.
The Produce Guard mounts on the two back Top Plate Support Posts.
3.
Install the Top Plate.