Chapter 3:
Installation
Preparing for Installation
There are several things you should do when preparing to install a 7893. Each of these is
discussed in the following sections.
Unpack the Unit
Unpack the unit according to the instructions printed on the box. After everything is out of the
box, take inventory to ensure that you have received all components. The following list
identifies the package contents.
7893 scanner
Power Supply
Scanner Cable
Documentation (also available from the NCR Web site (
www.ncr.com
)
Inspect the Unit for Damage
Inspect the unit for physical damage: broken or scratched scan window, broken or scratched
cabinet, and so forth. If the scanner has been damaged due to shipping, notify the shipping
carrier and the NCR representative. If other damages are found, notify NCR or the other
supplier if not purchased directly from NCR. Out of Box failures are handled through the NCR
customer Satisfaction Hot line.
3
Summary of Contents for RealPOS
Page 1: ...NCR RealPOSTM Presentation Scanner 7893 Release 1 0 User Guide 27355 B005 0000 1917 Issue A...
Page 16: ......
Page 18: ......
Page 36: ......
Page 132: ......
Page 152: ......
Page 156: ......
Page 164: ......
Page 166: ...B 2 Appendix B NCR Scanner Programming Tags Volume Adjustment 11817 Reset 11818...
Page 167: ...Appendix B NCR Scanner Programming Tags B 3 Default R0046 Programming Mode R0042 End R0043...
Page 171: ...Appendix B NCR Scanner Programming Tags B 7 Hex 0 R0048 Hex 1 R0049...
Page 172: ...B 8 Appendix B NCR Scanner Programming Tags Hex 2 R0050 Hex 3 R0051 Hex 4 R0052...
Page 173: ...Appendix B NCR Scanner Programming Tags B 9 Hex 5 R0053 Hex 6 R0054 Hex 7 R0055...
Page 174: ...B 10 Appendix B NCR Scanner Programming Tags Hex 8 R0056 Hex 9 R0057 Hex A R0058...
Page 175: ...Appendix B NCR Scanner Programming Tags B 11 Hex B R0059 Hex C R0060 Hex D R0061...
Page 180: ......
Page 182: ......
Page 184: ......
Page 187: ......