58
Document Number
DCV-00470
Date Released
Jul. 2020
Revision Number/Security level
R03 S2
Retrofit G6-300 + InvencoLink Wayne Vista 3V (US) Installation Guide
7 First Power-Up
Once the installation is complete and the wiring is certified (if necessary), power may be applied.
The G6-300 OPT takes a couple of minutes to complete its start-up phase, during which several
information screens will be presented.
The terminal will display the following screen whilst attempting to connect to the LAN. This screen will
persist until a connection can be made (Note: reported Firmware version may vary):
If the terminal is successful in connecting to the LAN it will display the following screen and the rest of the
start-up sequence will continue: