50
Document Number
DCV-00470
Date Released
Jul. 2020
Revision Number/Security level
R03 S2
Retrofit G6-300 + InvencoLink Wayne Vista 3V (US) Installation Guide
Fig. 6.13c
– Plug in earth cable
14. Bundle the connected cables with a cable tie as shown.
Fig. 6.14
–
Bundle connected cables with a cable tie.
15. Place Insulation Cover over top of the OPT. Re-attach the grounding cables with the previously
removed nut. Ensure the cover is placed under the three tabs at the top of the dispenser door.