Site Preparation 11
Physical Considerations
This section presents the following workstation information:
•
Handling instructions
•
Operating and service clearance requirements
•
Display mounting considerations
•
Workstation and component dimensions
•
Component weights
•
Airflow requirements
•
Power requirements
Handling System Components
Workstation system components can be moved by one person. However,
consider the following when moving the workstation or handling individual
components.
•
The 7140, 7158, 7161, 7194, and 7196 Printers do not attach to the drawer
unit and may slide off if the drawer unit is tipped.
•
Do not lift by the display.
•
The NCR 7448 Workstation does not attach to the drawer unit and may
slide off if the drawer unit is tipped.
Summary of Contents for 7448 Workstation
Page 1: ...NCR 7448 Workstation Release 1 3 Site Preparation B005 0000 1201 Issue D...
Page 12: ......
Page 15: ...Site Preparation 3 7448 Workstation with 80 Key Conventional Keyboard...
Page 39: ...Site Preparation 27 245 mm...
Page 41: ...Site Preparation 29 NCR 2182 Cash Drawer...
Page 57: ...Site Preparation 45...
Page 58: ......