
GV5/GV3.5 OPERATIONS & MAINTENANCE MANUAL
OPERATING THE TRANSMITTER
VERSION 0.2 2014-07-23
PAGE 3.2.185
Figure 3.2.159: Site Control Rule Editing Window
In the
Name
section, enter a name for the rule. This will display on the Site Control page, as
well the Logs page, when triggered.
In the
Severity
section, use the drop-down menu to select Low, Medium or High. The selected
severity level will display on the Status pageand Events Log. See
for a description of the severity levels for logged events.
In the
Delay
section, use the drop-down menu to select the time delay after activation that
the site control rule will take effect (i.e., be asserted). Select Immediate, 1 Sec, 2 Sec, 5 Sec, 10
Sec, 30 Sec or 60 Sec .
Check the
Latch
check-box if you want the assertion of the rule to require a reset. If not, leave
the box unchecked.
Check the
Log
check-box if you want the assertion of the rule to display an alarm and log the
event. If not, leave the box unchecked.
Summary of Contents for GV5
Page 2: ......
Page 4: ......
Page 8: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL PAGE 3 VIII VERSION 0 2 2014 07 23...
Page 16: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL DESCRIPTION PAGE 3 1 8 VERSION 0 2 2014 07 23...
Page 18: ...VERSION 0 2 2014 07 23 PAGE 3 1 10 LJXUH 9 9 XGLR 3DWK ORFN LDJUDP...
Page 239: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL ROUTINE MAINTENANCE PAGE 3 3 10 VERSION 0 2 2014 07 23...
Page 249: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL LIST OF TERMS PAGE 3 5 2 VERSION 0 2 2014 07 23...
Page 250: ......