GV20/GV15 INSTALLATION MANUAL
PRE-INSTALLATION / INSTALLATION ASSISTANCE
PAGE 2.11.2
VERSION 5.0 2021-03-01
The customer has prepared the RF coaxial cable – used to connect the transmitter to the antenna –
and installed the required connector. The customer has also installed the RF coaxial cable in place
and connected it to the antenna, while leaving the transmitter end of the cable unconnected.
Where required, all remote control and monitoring cables have been installed and connected to
the station equipment (e.g., modulation monitor, frequency monitor, and power meter).
The site has been made ready for the equipment, and adequate protection against lightning and
lightning-induced transients has been provided.
The transmitter has been unpacked, closely checked for any damage caused by shipping, and then
assembled.
The following test equipment has been made available at the site:
Two-channel oscilloscope (with probes)
Audio signal generator
Distortion analyzer
Spectrum analyzer
Modulation monitor
Frequency counter
50
test load (rated for 150% of carrier power, VSWR less than 1.1:1)
Nautel’s service representative takes full responsibility for commissioning the transmitter, validating all
external interfaces (i.e., the ac supply, RF output, remote control and monitoring equipment) and
checking out the equipment prior to activation. The service representative turns on the transmitter,
performs all adjustments and set-up procedures, and carries out proof of performance tests at the site.
These tests ensure that the transmitter is operating normally in compliance with its specifications. The
service representative also provides a demonstration and a short explanation of the operation of the
transmitter. Finally, the customer signs an Acceptance of Installation Certificate that provides feedback
to Nautel regarding the commissioning service.
Online Documentation
Nautel provides documentation online to customers, letting you familiarize yourself with specifications,
operation, maintenance and troubleshooting prior to the delivery of your equipment.
Documentation is also provided on USB and delivered with the transmitter.
Summary of Contents for GV20
Page 2: ......
Page 4: ......
Page 8: ...GV20 GV15 INSTALLATION MANUAL PAGE 2 VIII VERSION 5 0 2021 03 01...
Page 18: ...GV20 GV15 INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 5 0 2021 03 01...
Page 24: ...GV20 GV15 INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 6 VERSION 5 0 2021 03 01...
Page 36: ...GV20 GV15 INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 5 0 2021 03 01...
Page 50: ...GV20 GV15 INSTALLATION MANUAL COMMISSIONING PAGE 2 9 8 VERSION 5 0 2021 03 01...
Page 54: ...GV20 GV15 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 5 0 2021 03 01...
Page 64: ...GV20 GV15 INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 5 0 2021 03 01...
Page 65: ......