GV20/GV15 INSTALLATION MANUAL
INSTALLING CONTROL/MONITOR WIRING
PAGE 2.8.4
VERSION 5.0 2021-03-01
Figure 2.8.2: Remote Interface PWB Connections
REMOTE INTERFACE PWB
(A16)
CUSTOMER
ALARM/STATUS
TERMINAL BLOCK
TB2 (25 terminals)
CUSTOMER
CONTROL
TERMINAL BLOCK
TB3 (25 terminals)
EXTERNAL
INTERLOCK
TB1(terminals
1 and 2)
FRONT DOOR REMOVED FOR CLARITY
** EACH REMOTE CONTROL/MONITOR ENTRY HOLE HAS A REMOVEABLE PLATE WITH A PRE
CUT 1/4-INCH DIA HOLE. USE A CHASSIS PUNCH TOOL (e.g., GREENLEE) TO CREATE DESIRED
HOLE SIZE IN THE PLATE(S). REMOVE EACH PLATE (FOUR M4 SCREWS) BEFORE PUNCHING.
REMOVE THE PLATE TO ACCESS A 2.5-INCH HOLE, IF NECESSARY.
LAN
connector J1
REMOTE CONTROL/
MONITOR ENTRY OPTIONS**
Use front holes (left hole preferred) for
remote interface PWB connections
(including LAN). Use rear hole for
controller connections.
Summary of Contents for GV20
Page 2: ......
Page 4: ......
Page 8: ...GV20 GV15 INSTALLATION MANUAL PAGE 2 VIII VERSION 5 0 2021 03 01...
Page 18: ...GV20 GV15 INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 5 0 2021 03 01...
Page 24: ...GV20 GV15 INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 6 VERSION 5 0 2021 03 01...
Page 36: ...GV20 GV15 INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 5 0 2021 03 01...
Page 50: ...GV20 GV15 INSTALLATION MANUAL COMMISSIONING PAGE 2 9 8 VERSION 5 0 2021 03 01...
Page 54: ...GV20 GV15 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 5 0 2021 03 01...
Page 64: ...GV20 GV15 INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 5 0 2021 03 01...
Page 65: ......