Index
I-2
ni.com
full-bridge configuration II, 2-9, 4-15
full-bridge configuration III, 2-10, 4-17
G
gain
configuration, 3-3, 4-25
questions about, C-1
H
half-bridge configuration I, 2-6, 4-9
half-bridge configuration II, 2-7, 4-11
hardware overview
timing signal routing
device and RTSI clocks, 4-34
programmable function inputs, 4-33
I
installation, configuration, and operation
injector/ejector handle position
calibration
M
measurements
calibrating SCXI-1520, 5-16
strain gauge connections
full-bridge configuration I, 2-8, 4-13
full-bridge configuration II, 2-9, 4-15
full-bridge configuration III,
half-bridge configuration I, 2-6, 4-9
half-bridge configuration II,
quarter-bridge configuration I,
quarter-bridge configuration II,
N
NI-DAQ software, C-1
null compensation
null potentiometers
coarse and fine control codes (table), 4-27
configuring, 3-3
questions about, C-1
O
theory of
operation
P
PFIs (programmable function inputs)
posttriggered data acquisition
overview, B-2
typical acquisition (figure), B-2
null potentiometers
pretriggered acquisition
overview, B-2
typical acquisition (figure), B-2
Q
quarter-bridge configuration I, 2-4, 4-4
quarter-bridge configuration II, 2-5, 4-6
questions and answers, C-1